What Remodeling and Construction Cost in Los Angeles: Our Published Budgeting Estimates

This page collects every cost estimate Green Design and Build has published, grouped by service, so you can see in one place what an ADU, a kitchen, a bathroom, a room addition, a re-roof or a whole-home renovation typically costs in Los Angeles. We are a licensed general contractor (CSLB #1110975) and design-build remodeler based in Van Nuys, serving homeowners across Los Angeles County, Orange County, Ventura County, western Riverside County and western San Bernardino County (Ontario, Rancho Cucamonga and neighbouring cities). Read the figures the way we use them: as budgeting estimates, not a price list. Real projects come in lower and higher than these ranges, and the only number that means anything for your house is a written proposal, which we deliver within about 48 hours of a roughly two-hour site visit.

Why we publish estimates instead of prices

Most contractors will not put a number on a website. We do, because a homeowner who knows that a detached ADU in Los Angeles runs into the hundreds of thousands of dollars, not tens of thousands, has a better first conversation with us and with everyone else they call. But a range on a page is not an offer. Every figure below depends on the house, the scope and the finishes, and on what we find when we open a wall in a 1950s Valley ranch house. So each table carries the same sentence, and we mean it every time: these are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Who we are

Green Design and Build is led by Dekel Sofer. We hold a 4.7-star rating across 146 Yelp reviews and have completed hundreds of projects. We are a full-service residential general contractor and design-build remodeler for projects of every size, which is why this page runs from a $500 roof repair to a full second story: the same company, the same licence and the same proposal format apply to all of it.

How to read these numbers

All-in means all-in. Unless a table says otherwise, a range covers design, engineering where needed, permits and plan check, demolition, construction, the licensed trades and standard finishes. It does not cover furniture, landscaping, a pool or the cost of living somewhere else during the work.

Allowances. A proposal lists an allowance for anything you have not yet chosen: tile, plumbing fixtures, lighting, appliances, cabinet hardware. Pick above the allowance and the price rises by the difference; pick below it and it falls. The ranges here assume normal mid-range to upper-mid-range selections.

Contingency. On any home built before 1980 we recommend holding 15 to 20 percent of the budget in reserve for what demolition reveals: galvanized pipe, undersized panels, rotten subfloor, unbolted sill plates. The published examples below show why. A $22,000 bathroom refresh finished at about $28,500 after a failed tub overflow gasket had rotted the plate and subfloor, and a $180,000 detached ADU finished at $265,000 once a clay sewer line had to be rerouted and the panel upgraded.

Permits and fees. Permit and plan-check fees, school fees and utility charges are set by the city, the district and the utility, not by us. They appear as their own lines on a proposal and are passed through at cost.

Low end, high end. The low end of a range is a straightforward house, an easy site and stock finishes. The high end is a difficult site, structural work, relocated plumbing or custom finishes. A project can sit below or above either end.

ADUs and garage conversions

Scope Typical Los Angeles estimate What moves it
Garage conversion ADU $100,000–$200,000 Slab and footing condition, sewer line, electrical panel, whether the garage is rebuilt on its footprint
Detached ADU, about 500 sq ft $180,000–$260,000 Utility trenching distance, soil, panel upgrade, finish level
Detached ADU, 700–800 sq ft $225,000–$350,000 Same, plus a second bedroom and bathroom
Detached ADU, about 1,000 sq ft $300,000–$450,000+ Two-story or hillside design, fire-zone construction
Rule of thumb, detached ADU $300–$450 per sq ft all-in Difficult lots and higher-end construction run past $500 per sq ft
Timeline 6–12 months from first meeting to move-in City plan-check time, utility connections

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Two published examples show the spread. Our ADU cost guide retells a detached ADU that started at $180,000 and finished at $265,000: the clay sewer reroute alone was about $14,000, the 200-amp panel upgrade $6,000 to $8,000, and the utility work added roughly three weeks. Our post on why ADU quotes vary so much between contractors follows a garage conversion that rose about 40 percent, from around $85,000 to $130,000, once the slab, panel and sewer were opened up. Service pages: ADUs and garage conversions; cost guide: garage conversion cost.

Kitchen remodeling

Scope Typical Los Angeles estimate What moves it
Cosmetic refresh, same layout $25,000–$40,000 Stock or semi-custom cabinets, counters, backsplash, paint, appliance swaps
Mid-range remodel, same layout $40,000–$70,000 Semi-custom or custom cabinets, stone counters, flooring, electrical updates, new plumbing
Full remodel with layout changes $70,000–$100,000+ Wall removal, relocated sink or range, new circuits, island with power, custom cabinetry
100-to-200-amp panel upgrade, when needed $6,000–$8,000 Utility service, meter location
Timeline Design and selections 3–6 weeks; permits 1–6 weeks; construction 4–8 weeks (same layout) or 8–12 weeks (layout or structural changes) Custom cabinets take about three weeks to manufacture

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

We do not start demolition on a kitchen until you have approved a 3D rendering and every selection, so the cabinets are in production when the old kitchen comes out. Service page: kitchen remodeling; cost guide: kitchen remodel cost; and read what homeowners wish they knew before remodeling a kitchen.

Bathroom remodeling

Scope Typical Los Angeles estimate What moves it
Basic refresh $8,000–$18,000 New flooring, tub surround or shower tile, vanity, toilet, faucets, lighting, paint
Mid-range remodel $18,000–$40,000 Tub-to-shower conversion, relocated vanity, moved plumbing, frameless glass, heated floor
High-end renovation $40,000–$80,000+ Full layout reconfiguration, custom cabinetry, natural stone, steam shower, freestanding tub
With structural or major plumbing and electrical work $100,000+ Moving walls, second-floor drains, slab cutting

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

The published example: a $22,000 refresh that finished at about $28,500, roughly 30 percent over, after demolition uncovered a failed tub overflow gasket that had rotted the plate and subfloor. Service page: bathroom remodeling; cost guide: how much a bathroom remodel costs; related: walk-in shower guide and the order a bathroom remodel runs in.

Room additions

Scope Typical Los Angeles estimate What moves it
Ground-floor addition, per sq ft $300–$500 Foundation type, matching the existing roof, HVAC extension
Second-story addition, per sq ft $400–$650 Engineering, new foundation work below, temporary roof, living through it
Bedroom or home office, ground floor, 200–350 sq ft $75,000–$150,000 Bathroom or not, closet, exterior finish
Primary suite with bathroom, ground floor, 350–500 sq ft $130,000–$250,000 Plumbing runs, finish level
Family room or kitchen expansion, 300–500 sq ft $110,000–$230,000 Load-bearing wall removal, kitchen work inside the addition
Partial second story, 400–600 sq ft $200,000–$350,000 Stair location, structural upgrades to the floor below
Full second story, 800–1,200 sq ft $350,000–$650,000+ Whole-house foundation and framing upgrades, new roof
Timeline, any addition 9–14 months end to end Second story: design and engineering 8–12 weeks, plan check 2–4 months, construction 5–7 months

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Zoning decides the size before price does: on a standard City of Los Angeles R1 lot the front setback is 20 feet or the prevailing setback, sides 5 feet, rear 15 feet, and the Baseline Mansionization Ordinance caps floor area at 45 percent of the lot. Service page: room additions; cost guide: room addition cost; related: removing a load-bearing wall.

Whole-home renovation

Scope Typical Los Angeles estimate What moves it
Cosmetic refresh, per sq ft $100–$175 Paint, flooring, fixtures, lighting; no layout changes
Multi-room renovation, per sq ft $150–$250 Kitchen and bathrooms redone, some walls opened
Full gut to the studs, per sq ft $250–$400 New plumbing, electrical, HVAC, insulation, windows, every finish
Gut plus structural changes, per sq ft $350–$500+ Wall removal, foundation work, roofline changes
Typical project total $100,000–$300,000+ House size and how many tiers above apply
Timeline 2–5 months of construction plus 1–3 months of design and permitting Feasibility 2–4 weeks, design and engineering 10–20 days, plan check 1–6 weeks, close-out 1–4 weeks

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: whole-home renovation; cost guide: whole-home renovation cost; overview: remodeling services.

New home construction

Scope Typical Los Angeles estimate What moves it
Ground-up house, all-in per sq ft $300–$600 per sq ft Includes design, engineering, permits and construction; excludes land. Hillside sites, deep foundations and custom finishes push past the top
Timeline Longer than a second-story addition’s 9–14 months Design, engineering, City Planning clearances and LADBS plan check take most of the extra time

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

A new house depends on the lot before the finishes, so we run a feasibility check before quoting anything. Service page: new home construction; cost guide: what a Los Angeles general contractor costs.

Roofing

Per square foot of roof, and for a typical 1,500–2,000 sq ft single-story roof.

Scope Typical Los Angeles estimate What moves it
Roof repair $500–$3,000 by the job Leak location, flashing, number of penetrations
Composition shingle, tear-off and replace $5–$10 per sq ft; $12,000–$25,000 Layers removed, plywood replaced, ridge vents
Concrete tile, new roof $10–$20 per sq ft; $20,000–$45,000 Profile, underlayment, framing check for weight
Clay tile, new roof $15–$30 per sq ft; $30,000–$65,000 Tile profile, hip and ridge detail
Tile lift and relay $8–$15 per sq ft; $15,000–$30,000 Breakage rate, underlayment product
Standing-seam metal $15–$30 per sq ft; $30,000–$65,000 Panel gauge and finish, roof complexity
Flat roof, torch-down $5–$10 per sq ft; $8,000–$20,000 Layers, drainage corrections
Flat roof, TPO single-ply $7–$14 per sq ft; $11,000–$28,000 Insulation board, parapet detail
Timeline Shingle 2–5 working days; tile 1–2 weeks; metal 1–2 weeks; flat 2–4 working days LADBS express re-roof permit in days; plan check 2–6 weeks where structure changes; solar removal and reinstall about a week each side

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: roofing; cost guide: roof replacement cost; permits: do you need a permit to replace a roof in Los Angeles.

Foundation and seismic work

Scope Typical Los Angeles estimate What moves it
Bolt-and-brace seismic retrofit $4,000–$12,000 Perimeter length, crawl-space access, existing bolts, engineered design
Crack repair, epoxy or polyurethane injection $500–$3,000 per area Crack width, number of cracks, ongoing movement
Drainage correction $3,000–$15,000 Length of drain, hardscape cut and replaced
House leveling and pier-and-beam repair $5,000–$25,000 How far the floor has dropped, posts and girders replaced
Underpinning with concrete or steel piers $10,000–$40,000 Number of piers, depth to competent soil, engineering
Partial or full foundation replacement $30,000–$100,000+ Linear feet replaced, whether the house is lifted, hillside access

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: foundation and structural work; related: warning signs your foundation needs repair.

Electrical, as part of a remodel or ADU

Electrical work on our projects is performed by licensed electricians and scheduled and supervised by us as your general contractor.

Scope Typical Los Angeles estimate What moves it
Panel upgrade, 100 to 200 amps, overhead service $4,000–$8,000 Meter location, grounding, permit
Panel upgrade with utility service change $8,000–$15,000+ Underground service, utility scheduling
ADU subpanel and feeder $2,000–$5,000 Trench length, feeder size
Dedicated circuit $300–$900 Distance to panel, attic or slab access
EV charger circuit $1,000–$2,500 Amperage, distance, panel capacity
Recessed light, each $150–$350 Attic access, Title 24 fixtures
Kitchen electrical package $3,000–$8,000 Circuits, GFCI, under-cabinet and island power
Bathroom electrical package $1,000–$3,000 Fan, GFCI, lighting, heated floor circuit
Whole-house rewire $15,000–$35,000 House size, plaster walls, attic access
Aluminum wiring remediation $2,000–$6,000 Number of connections

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: electrical.

Plumbing, as part of a remodel or ADU

Plumbing on our projects is performed by licensed plumbers and scheduled and supervised by us as your general contractor.

Scope Typical Los Angeles estimate What moves it
Fixture replaced in place $500–$2,500 Fixture cost, valve condition
Kitchen rough-in for an island $1,500–$5,000 Slab versus raised floor, venting
Bathroom plumbing relocation, raised foundation $2,500–$6,000 Crawl-space access, distance moved
Bathroom plumbing relocation, slab $5,000–$12,000+ Saw-cutting, trenching, slab repair
Whole-house repipe, copper or PEX $8,000–$25,000 Fixture count, wall and ceiling patching
Tank water heater $2,000–$4,000 Venting, seismic strapping, location
Tankless water heater $4,500–$9,000 Gas line sizing, venting, electrical
Heat-pump water heater $4,000–$8,000 Location, condensate, 240-volt circuit
Sewer lateral replacement, open trench $5,000–$15,000 Depth, length, hardscape replaced
Sewer lateral, trenchless $8,000–$20,000 Pipe condition, access pits
ADU utility connections $8,000–$25,000 Distance to main house connections, meter requirements

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: plumbing.

Windows and doors

Scope Typical Los Angeles estimate What moves it
Retrofit vinyl window, installed $700–$1,500 Size, glass package, grids
Retrofit fiberglass window, installed $1,200–$2,500 Brand, color, glass
Aluminum-clad wood window, installed $1,500–$3,500 Species, finish, hardware
New-construction (nail-fin) install, added per opening +$300–$800 Stucco cutting and patching, flashing
Enlarging an opening, added +$2,500–$6,000 Header, structural review, plan check
Sliding patio door $2,000–$6,000 Width, material, glass
Entry door system $2,500–$8,000+ Material, sidelights, hardware
Multi-panel bifold or slider system $10,000–$30,000+ Width, structural header, threshold detail
Whole house, 10–15 windows $10,000–$25,000 Material and glass; install 1–3 days

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: windows and doors.

Painting

Scope Typical Los Angeles estimate What moves it
One room, interior $500–$1,500 Ceiling, trim, repairs
Whole interior $6,000–$18,000 Square footage, ceiling height, prep
Exterior, single-story stucco $6,000–$14,000 Stucco condition, colors, trim
Exterior, two-story or wood siding $12,000–$30,000 Access, scraping, wood repairs
Elastomeric coating, added +$2,000–$6,000 Wall area, crack condition
Cabinet painting $3,500–$9,000 Door count, spray finish
Stucco repair $500–$2,500 Patch size, texture match
Wood rot repair $500–$3,000 Fascia, trim, sills replaced

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: painting; related: what to ask before hiring an exterior painter.

Flooring

Installed, per square foot, material plus labor.

Scope Typical Los Angeles estimate What moves it
Carpet with pad $4–$9 Grade, stairs
Laminate, floating $5–$10 Product, transitions
Luxury vinyl plank, floating or glue-down $6–$12 Product, subfloor prep
Engineered hardwood $10–$18 Species, plank width, glue-down versus float
Solid hardwood, site-finished $12–$22 Species, finish, pattern
Porcelain or ceramic tile $12–$25 Tile size, layout, waterproofing
Hardwood refinishing $4–$8 Stain, repairs
Demolition and haul-off, added +$1–$3 Material removed, tile versus carpet
Self-leveling underlayment, added +$2–$5 How far out of level
Moisture mitigation on a slab, added +$3–$6 Test results
Acoustic underlayment for a condo, added +$1–$3 HOA sound rating

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service page: flooring; related: should you DIY a floor replacement.

Pavers, driveways and concrete

Scope Typical Los Angeles estimate What moves it
Interlocking concrete pavers, installed $15–$25+ per sq ft Pattern, base depth, edge restraint
Poured concrete, standard finish $8–$18 per sq ft Thickness, rebar, access
Stamped concrete $15–$25+ per sq ft Pattern, color, sealer
Natural stone $25–$50 per sq ft Stone, thickness, setting method
Permeable pavers $20–$35 per sq ft Open-graded base depth
Demolition of an existing slab $1,500–$3,000 per job Thickness, haul distance
300 sq ft paver patio $4,500–$7,500+ Demo, grading, drainage
600 sq ft two-car paver driveway, old slab removed $10,500–$18,000+ Base, curb cut, approach

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

The published example: a driveway budgeted at $7,000 that reached about $11,000 because of site conditions. Service page: pavers; cost guide: concrete driveway cost; related: DIY pavers versus hiring a professional.

Patio covers and outdoor living

Scope Typical Los Angeles estimate What moves it
Patio cover, any material $25–$75 per sq ft Material, attached versus freestanding, electrical
12 x 20 ft (240 sq ft) cover $6,000–$18,000 See material rows below
Alumawood or aluminum lattice $25–$45 per sq ft; $6,000–$10,800 Post count, color
Alumawood solid $30–$55 per sq ft; $7,200–$13,200 Fan beam, gutters
Insulated aluminum $45–$75 per sq ft; $10,800–$18,000 Panel thickness, lighting
Wood $40–$80 per sq ft; $9,600–$19,200 Species, stain, engineering
Steel $60–$110 per sq ft; $14,400–$26,400 Spans, finish
Minimum for anything installed and permitted $4,000–$5,000 Smallest covers
Freestanding rather than attached, added +$1,500–$4,000 Footings, engineering
Outdoor electrical for fans, lights or heaters $1,000–$3,500 Circuit distance
Permits and plan check $400–$1,500 City, engineered or not
Engineering $800–$2,500 Spans, wind, freestanding
Vinyl fencing, installed About $90 per linear foot Height, gates

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Service pages: patio covers and outdoor living; cost guides: patio cover cost, backyard remodel cost and vinyl fence installation cost; related: the best materials for patio covers.

What we need to give you a real number

A range becomes a proposal after four things.

  1. A site visit of about two hours. We measure, photograph the existing plumbing, electrical and framing, check the panel, the sewer cleanout, the crawl space or slab, access for equipment and, for additions and ADUs, the lot’s setbacks and overlays.
  2. A scope in writing. What is in, what is out, and what is an allowance. If you have not chosen tile yet, the proposal says so and carries an allowance for it.
  3. Your selections, or a finish level. Stock, semi-custom or custom cabinets; quartz or stone; vinyl, fiberglass or clad wood. The finish level moves a kitchen from one tier to the next more than anything else.
  4. The house’s age and condition. Pre-1980 framing, galvanized pipe and a 100-amp panel are priced in from the start rather than discovered halfway through, and the contingency is set accordingly.

You receive the itemized proposal within about 48 hours of the visit. The visit and the proposal are free. Request one on our contact page, or read how design-build works at Green Design and Build first.

How payment works

California law caps the down payment on a home improvement contract at $1,000 or 10 percent of the contract price, whichever is less, and a contractor cannot collect payment for work not yet completed or materials not yet delivered. Our contracts follow that: a small deposit, then progress payments tied to completed milestones, with the final payment after the walkthrough and the last inspection. We offer financing programs through Synchrony, Service Finance and Home Run Financing; terms depend on the lender and your credit approval. Details are on our financing page and in our guide to contractor payment schedules in California. Our labor is covered by a one-year warranty.

Where we do this work

The ranges on this page are Los Angeles ranges, and the counties around it move them in predictable ways. In Los Angeles County and the San Fernando Valley, LADBS plan-check time and pre-1980 housing set the contingency; hillside and fire-zone lots add engineering and Chapter 7A materials. In Orange County, HOA architectural review in master-planned communities adds time before the city permit, and newer slab-on-grade homes make plumbing relocation the expensive item. Ventura County brings fire-zone construction in Thousand Oaks and Simi Valley and each city’s own building division. Western Riverside County and western San Bernardino County have newer tract housing, expansive soils that decide foundation design, and lower plan-check queues than the City of Los Angeles. See every area we serve.

Frequently asked questions

Are the figures on this page your prices?

No. The figures on this page are typical Los Angeles budgeting estimates, not a price list or a quote, and a real project can come in lower or higher depending on the house, the scope and the finishes. Green Design and Build publishes them so homeowners can budget realistically before the first call. The only real number for your home is a written, itemized proposal after a site visit.

Why do your estimates have such wide ranges?

The ranges are wide because the same scope costs very different amounts in different houses: a same-layout kitchen in a 1990s Irvine house and one in a 1952 Van Nuys ranch with galvanized pipe and a 100-amp panel are not the same job. Finish level moves the number as much as the house does. A written proposal narrows the range to a single figure by pricing your house, your scope and your selections.

What does “all-in” include?

All-in, on this page, means design, engineering where needed, permits and plan check, demolition, construction, the licensed trades and standard finishes. It does not include furniture, landscaping, a pool, a detached structure or the cost of living elsewhere during the work. Permit, school and utility fees are passed through at cost and shown as their own lines on the proposal.

How much contingency should I hold?

Green Design and Build recommends holding 15 to 20 percent of the budget in reserve on any home built before 1980. The published examples show why: a $22,000 bathroom refresh that finished at about $28,500 after a rotted subfloor was found, and a $180,000 detached ADU that finished at $265,000 after a clay sewer reroute and a panel upgrade. Newer homes need less, but no remodel of an occupied house should be budgeted to the last dollar.

How do I get an actual quote?

Request a free site visit through our contact page or by calling (800) 348-3050. We walk the property for about two hours, confirm the scope and your selections, and deliver an itemized written proposal within about 48 hours. The proposal lists what is included, what is excluded and what is an allowance, so you can compare it line by line with any other bid.

Do these estimates apply outside the City of Los Angeles?

Broadly, yes: the ranges on this page are typical for Los Angeles, and Green Design and Build works from the same estimates across Orange County, Ventura County, western Riverside County and western San Bernardino County. Local factors shift them: HOA review in Orange County master-planned communities, fire-zone construction in Ventura County and the hillsides, expansive soils in Corona and Ontario, and each city’s own plan-check times and fees. The site visit accounts for all of it.

Turn a range into a number

Every figure on this page is an estimate until we have walked your house. Request a free site visit and you will have an itemized written proposal within about 48 hours, with nothing hidden in the fine print.