
Garage Conversions in Los Angeles and Across Southern California
Green Design and Build, a licensed general contractor (CSLB #1110975) based in Van Nuys, takes garage conversions from feasibility and plans through permits and construction across Los Angeles and Southern California, and a garage conversion ADU in Los Angeles typically costs $100,000–$200,000 with three to five months of construction.
Explore a garage conversion or a new detached ADU with one team for feasibility, plans, permits and construction. Start with a free consultation about your property.
An ADU Built From What You Already Have
A garage conversion turns unused space into a fully functional accessory dwelling unit without the cost and footprint of new construction, while a new detached ADU builds that living space from the ground up when a garage isn’t the right fit. This page is about converting the garage you already have; new detached units are covered on our ADU construction page.
We work with homeowners who need practical guidance on what their property allows, whether that means converting an existing garage or building a new detached unit. Every project is approached with attention to detail, jobsite professionalism, and service tailored to the scope of work.
What We Do
Garage Conversion and ADU Services Built to Last
Our team handles both garage-to-ADU conversions and new detached ADU construction, guiding each project from design through final completion.
Garage-to-ADU Conversion
Converting an existing garage into a code-compliant living space with its own kitchen, bathroom, and utilities.
New Detached ADU Construction
Ground-up ADU builds designed around your lot when a garage conversion isn’t available or the right fit.
Permitting and Planning
Guidance through local ADU and garage conversion requirements, from initial planning through permit approval.
Interior Buildout and Finishes
Plumbing, electrical, insulation, and finish work to bring the new living space up to full livable standards.
Where we convert garages
Most of our garage conversions are inside the City of Los Angeles and the San Fernando Valley, where the City’s ADU ordinance, the LADBS garage conversion permit process and the typical detached-garage lot are well known to us; our Van Nuys office is in the middle of that work. See ADU pricing for the City of Los Angeles for what a conversion costs there. Orange County and Ventura County cities apply the same state ADU law through their own building divisions, and western Riverside County and western San Bernardino County lots tend to be larger, which sometimes makes a detached ADU the better option (see our ADU builder in Los Angeles page) than converting the garage.
Garage conversions by area: Los Angeles · San Fernando Valley · Van Nuys · Sherman Oaks · Orange County · Ventura County · Western Riverside County. Full list: areas we serve.
Garage Conversion & ADU FAQ
Answers to common questions from homeowners considering a garage conversion or new ADU.
What is the difference between a garage conversion and a new ADU?
A garage conversion transforms your existing garage into a livable ADU, while a new detached ADU is built from the ground up on an available part of your property. We handle both, depending on what your property allows.
Is my garage eligible for conversion?
Eligibility depends on your garage’s size, condition, and local requirements. We evaluate your property to determine whether a conversion or a new detached build makes more sense.
Do I need a permit for a garage conversion or new ADU?
Yes. Both garage conversions and new ADUs require permits. We handle the permitting process as part of the project.
What does a garage conversion typically include?
A full conversion typically includes framing and insulation upgrades, plumbing and electrical work, and finishes needed to bring the space up to livable standards, along with its own kitchen and bathroom.
How much does a garage conversion cost in Los Angeles?
A garage conversion ADU in Los Angeles typically costs $100,000 to $200,000, and most two-car conversions land between $100,000 and $150,000 once the kitchen, bathroom, insulation, electrical and plumbing are included. The slab, drainage, sewer lateral and electrical panel move a project within that range; our garage conversion cost guide breaks it down.
How long does a garage conversion or ADU project take?
A garage conversion ADU usually finishes at the short end of our published timeline of six months to a year from first meeting to move-in, because there is no foundation or framing phase. The city must approve or deny a complete application within 60 days, and construction typically takes three to five months; a new detached ADU needs five to eight months of construction.
Which areas do you serve?
We serve clients across Los Angeles County, the San Fernando Valley, Ventura County, Orange County, western Riverside County, and western San Bernardino County.
Want a real number for your project?
The site visit and the itemized written estimate are free.
Recent projects
Garage conversions we have completed.
- Garage-to-ADU Conversion in Los Angeles — an unused detached two-car garage converted into a roughly 500 sq ft ADU with its own kitchen, bathroom and entrance.
More completed work, with before, during and after photographs, is in the project gallery.
Tell us about your ADU project
Tell us what you are planning and where. Our team will respond within one business day to discuss your property and next steps.
Why a garage conversion is usually the cheapest route to a legal ADU
A detached ADU is a new building: new foundation, new walls, new roof, new utility runs and solar panels under the state Energy Code. A garage conversion starts with a slab, a structure and a roof that already exist and are already inside your setbacks. That is why the same square footage almost always costs less as a conversion than as new construction. For what a conversion actually costs, see our garage conversion cost guide.
California law also treats conversions more favorably than new builds, in ways many homeowners are never told:
- You do not have to replace the parking. If you convert a garage, carport or other off-street parking into an ADU, the city cannot require you to rebuild those spaces somewhere else on the lot.
- No parking can be required for the new unit either. ADUs converted from existing space are exempt from parking requirements altogether — as are properties within half a mile of public transit and those in historic districts.
- No impact fees at 750 square feet or less. Most garage conversions land comfortably below that line. Above it, fees have to be charged proportionally to the size of the main house.
- Fire sprinklers are not required in the ADU if they are not required in your main house.
- Size: no city may cap an ADU below 850 square feet, or 1,000 square feet with more than one bedroom (Gov. Code § 66321(b)(2)). A standard two-car garage is usually around 400 square feet, so size is rarely the constraint on a conversion — the existing structure is.
The 60-day rule
Under Government Code § 66317, once a permitting agency has a completed application it must approve or deny it within 60 days. Miss the deadline and the application is deemed approved. Deny it, and the agency has to return a full written list of what is deficient and how to remedy it, inside the same 60 days.
The leverage is in the word completed. A conversion submitted with the structural, electrical and plumbing detail already resolved starts the clock immediately. One submitted thin does not start it at all.
What a garage actually needs to become livable space
A garage is built to shelter a car, not a person. Turning one into permitted living space means bringing it up to the standard of a dwelling, and the work that decides your budget is mostly invisible in the finished room:
- The slab. Garage slabs slope to the door for drainage and often sit lower than the house. Leveling, raising or insulating that floor is frequently the single biggest line item.
- Moisture and drainage. Where the garage meets the driveway is where water has been going for decades. That has to be resolved before anything is finished.
- Insulation and conditioning. Walls, roof and floor all need to perform to residential energy standards, not garage ones.
- Structure at the door opening. Removing a garage door leaves a wide span that has to be framed and headed properly, especially on a load-bearing wall.
- Plumbing and sewer. A kitchen and bathroom mean running supply and waste to a structure that has neither, and confirming your sewer lateral can take a second unit.
- Electrical. A separate dwelling usually needs its own subpanel, and your main panel may need upgrading before that is possible.
- Light, ventilation and egress. Habitable rooms have requirements a garage was never designed to meet, which is why window and door openings usually change.
Any quote that does not account for the slab, the drainage and the panel is a quote that will change later.
Attached garage, detached garage, or build new?
- Detached garage at the back of the lot — usually the cleanest conversion. It already reads as a separate dwelling, has its own entrance, and gives the tenant or family member real privacy.
- Attached garage — cheaper to run services to, but you have to think carefully about sound separation and about giving the unit its own front door rather than one through your house.
- Build new instead — worth comparing if the garage is small, structurally poor, or badly placed. A detached ADU costs more but you control the layout completely, and most cities allow up to 1,200 square feet (no city may cap you below 850, or 1,000 with more than one bedroom), at 16 feet tall, or 18 feet within half a mile walking distance of a major transit stop or high-quality transit corridor.
We will walk your garage, look at the slab and the panel, and tell you honestly which of the three makes sense on your lot — including when the answer is that converting is not worth it.
Check your own lot against these rules: our California ADU rules calculator reports the size, height, setbacks, parking and impact fees your city is required to allow, with the statute behind each answer. For the local rules on top of the state floor, see our city-by-city guides: ADU rules by city, including Los Angeles, Glendale, Pasadena, Burbank, Santa Clarita, Thousand Oaks, Irvine, Anaheim and Corona.
Rules summarized on this page reflect California ADU law and City of Los Angeles requirements as published in 2026, drawn from the California Department of Housing and Community Development, the California Government Code (§§ 66311.5, 66313, 66314, 66317, 66321, 66322, 66323, 66333, as amended by SB 543 effective 1 January 2026) and LADBS. Requirements change, and your city may differ — confirm current rules for your property before making decisions. Page last reviewed August 2026.
Building new instead? The City keeps a catalog of pre-approved ADU designs that shorten plan check, including one it gives away free. We explain how it works in our guide to ADU plans in Los Angeles, the City’s pre-approved standard plans.
Related guides
Design ideas
If you are still working out what you want, we have written up the design decisions in this trade — what each choice does to the space, what it costs, and which ones you cannot undo later: Garage conversion design ideas. If you are weighing a new unit instead, the design ideas hub covers ADUs and every other trade.

