3D design rendering of a double-height living room open to the dining area, with a sectional, mezzanine balcony and chandelier
A living room as the homeowner saw it before construction started

Most homeowners approve a floor plan they cannot actually read. A set of 2D drawings makes sense to a builder because a builder has stood in a hundred rooms that started as those lines. To everyone else it is a diagram. People nod at it, sign it, and then get genuinely surprised when the island is where the island always was on the drawing.

So before we build anything, we build it in 3D first. You walk through the finished project on a screen, change what you do not like, and only then does anything get ordered or demolished. That applies to every project of real size we take on — kitchens, bathrooms, ADUs, additions and whole backyards — not just one room type.

What you actually get

Still renderingsThe finished space from several angles, with the real materials, finishes and colours you have selected — not a generic model.
A walkthrough videoAn animated pass through the project, which is the version most people finally “get” it from.
An interactive 3D modelYou move around it yourself, at your own pace, as many times as you want.
Floor plans and layoutsDimensioned 2D drawings alongside the 3D, because the dimensions are what get built and permitted.

The interactive model is the part that matters most and the part almost nobody else provides. A rendering shows you the angle the designer chose. A model lets you stand where you will actually stand — at the sink, in the doorway, on the step down to the pool — and that is where people catch the things they would otherwise catch on day forty of construction.

When it happens, and why it is after you sign

The 3D design is the first deliverable under the construction contract, not a free pitch before it. We do a site visit of about two hours, put a written proposal in your hands within 48 hours, and once the contract is signed the design work begins.

We are deliberate about that order, and it is worth saying plainly why. A contractor who produces a full 3D design for free is paying for that work somewhere, and it is either in the price of the jobs they win or in the corners they cut later. Design is real work by real people, and it takes as long as it takes. Charging for it is what lets us do it properly rather than fast enough to win a signature.

How the design fee works

The design is a paid step, and the fee is credited against your construction contract when you build the project with us. If you go ahead — which is the normal outcome — the design has cost you nothing on top of the job. If you decide not to build, you have paid for design work and you keep it.

What that arrangement buys you is a design team whose only job is to get the project right, working under the same contract as the people who will build it. There is no handoff, no “the architect drew something we cannot build for that number”, and no second round of fees to reconcile a drawing with reality.

What the 3D step actually prevents

This is not about pretty pictures. Every item below is a real cost that lands on real projects, and the design step is where each one gets removed.

Change orders

The overwhelming majority of cost overruns on residential projects are not surprises inside the walls. They are decisions made too late — someone sees the space taking shape and realises they want it different. That decision is free in a model and expensive in a half-built room, because it is no longer a drawing, it is demolition plus rework plus a stalled schedule.

Lead times

Custom cabinets take about three weeks to manufacture. If the cabinet layout is still being discussed when the old kitchen comes out, you are living without a kitchen for those three weeks for no reason. Because every selection is locked before demolition, the cabinets are already in production when the demo crew arrives.

Things you cannot undo

Concrete is the clearest example. On the Encino backyard we built, the outdoor kitchen has gas, water and electrical running to it under a paver deck. Moving it six feet in the model cost nothing. Moving it after the trenches are backfilled and the pavers are down is a different project.

Plan check

What gets permitted has to match what gets built. Resolving the design fully before submittal means the drawings that go to plan check are the drawings of the actual project, which is a large part of why corrections get cleared in one cycle rather than three.

3D design rendering of a full-height marble fireplace wall with a linear gas fireplace, floor-to-ceiling curtains and a crystal chandelier
Material and lighting decisions are made at this stage, not on site

A worked example: an empty lot in Encino

A homeowner in Encino had a backyard that was bare dirt and no idea what should go in it. What he asked us for was ideas and a 3D design. What came out of that was a pool with a raised spillover spa, paver decking, stucco and brick perimeter walls, a built-in bench and a built-in outdoor kitchen — designed as one space rather than assembled from separate contractors’ ideas of it.

Three months from the first machine on site to handover. He approved the yard before a shovel went in the ground, and what got built is what he approved. You can see the full project, including the construction sequence, on the Encino backyard project page.

3D design rendering of an oak kitchen with a full marble backsplash, under-cabinet lighting and full-height cabinets
Every finish shown is a selection made and approved before ordering

Frequently asked questions

Do you do a 3D design for every project?

For every project of meaningful size, yes — kitchens, bathrooms, ADUs, room additions, whole-home renovations and complete backyards. Very small or purely like-for-like jobs may not need one.

Is the 3D design free?

No. It is a paid design step, and the fee is credited against your construction contract when you build the project with us. If you build with us — which is what normally happens — the design effectively costs you nothing on top of the job.

Can I change things after I see the 3D?

That is the entire point of the step. Changes at the model stage are the cheapest changes you will ever make on your project. We do not start demolition and nothing gets ordered until you have approved the design and every selection.

What if I do not know what I want yet?

That is a normal starting point. Plenty of our projects begin with a homeowner asking us to come up with ideas. We survey the site, work through how you actually want to use the space, and produce a design you can react to — reacting to something real is far easier than describing something imaginary.

Do I need an architect as well?

For most remodels, additions and ADUs in California, no. Our design-build process page explains where California law does require a licensed architect and where it does not.

Who does the structural and energy work?

Where a project needs it, a structural engineer designs the beams, foundations and shear walls, a soils engineer reports on hillside and questionable lots, and a Title 24 energy consultant prepares the compliance forms. All of it is coordinated under our contract.

Start with a site visit

The way in is a site visit — about two hours, on your property. You get a written proposal within 48 hours of it. If the project makes sense for both of us, the 3D design is the first thing we produce.