Paver Patio Cost in Los Angeles: What Moves the Number

A paver patio in Los Angeles costs $15 to $25 or more per square foot installed. A 500 square foot patio, enough for a dining table, a grill and a pair of loungers, lands between $7,500 and $12,500 in standard concrete pavers. Porcelain and natural stone push the top of the range higher, and an old slab that has to come out first adds $1,500 to $3,000. These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

Green Design and Build installs paver patios, walkways and driveways across Los Angeles County, the San Fernando Valley, Orange County, Ventura County, western Riverside County and western San Bernardino County. This guide explains what is inside the number, what moves it, and how to read a bid that is much lower than the rest.

What the square-foot price includes

A paver patio is not a surface. It is a compacted aggregate base with a wearing course on top, and the base is most of the labor. The installed figure covers excavation, hauling spoil, base compacted in lifts, bedding sand, the pavers, cutting, an edge restraint and joint sand. Almost every heaved patio and sunken corner we are called out to inspect failed in the base or the edge, not the paver.

ItemTypical installed cost
Standard concrete pavers, simple pattern$15–$25+ per sq ft
Porcelain pavers$25–$40 per sq ft
Travertine and other natural stone$25–$40+ per sq ft
Demolition and haul-away of an old slab$1,500–$3,000
Difficult access (no Bobcat, wheelbarrow through a side gate)Adds $500–$1,500+

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

What moves a patio within the range

Paver type. Standard concrete pavers are the workhorse. Porcelain is thinner, denser, does not stain or fade, but needs a flatter screeded bed and a diamond blade for every cut, so labor goes up with the material. Travertine and other natural stone vary in thickness piece to piece, which means more time setting each one flush and more breakage, and they need sealing to stay the color you bought.

Pattern and cuts. Running bond in one paver size is the fastest to lay. Herringbone, a three-piece random pattern or a circle kit needs more layout and more cuts, and curved edges generate far more waste than straight ones. On our jobs a curved patio in a multi-size pattern takes roughly a third longer than a straight one in running bond. See our paver design ideas for patterns and colors.

Base depth. For a patio we excavate for 4 to 6 inches of compacted base plus an inch of bedding sand, compacting in lifts of no more than 3 to 4 inches with a plate compactor. On Valley clay we go deeper and often add a separation fabric, because wet clay pumps up into the base. A bid that lists 2 inches of base is a bid for a patio that will settle.

Polymeric sand. Joint sand with a polymer binder hardens after wetting, keeps joints from washing out and slows weeds and ants. It is a small line item, but it needs a dry surface and a blower before the water goes on, or it leaves a haze.

Borders and steps. A soldier course border in a contrasting color adds a row of cuts around the perimeter. Steps over a block core and seat walls are priced per linear foot on top.

Access and what is already there. If a Bobcat cannot reach the yard, base comes in and spoil goes out by wheelbarrow through a side gate, and labor climbs. Removing an old slab is a real line item, not a rounding error: breaking, loading and hauling a cracked 400 square foot slab takes a crew most of a day. These two move the price more than paver color. The Anaheim paver driveway and side yard project shows what a full excavation, base and paver job involves on a difficult side yard.

Worked examples

Three common sizes at the standard concrete paver range, assuming normal access.

Patio sizeInstalled rangeWith old slab removal
300 sq ft (a small dining patio)$4,500–$7,500$6,000–$10,500
500 sq ft (dining plus a lounge area)$7,500–$12,500$9,000–$15,500
800 sq ft (dining, lounge and a grill area)$12,000–$20,000$13,500–$23,000

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

The arithmetic is the site figure times the square footage, plus slab removal. Porcelain or travertine starts roughly where the standard range ends, and difficult access adds on top. If the patio is part of a larger project with a cover or planting, the backyard remodel cost guide shows how the pieces add up.

Paver patio or concrete patio?

This is the decision most patio budgets turn on. Poured concrete runs $8 to $18 per square foot installed and stamped concrete $12 to $26, so concrete is cheaper on day one and reads as one clean plane. Pavers cost more up front and buy you repairability. These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

The honest answer depends on how the surface fails, not how it looks new. Every slab cracks eventually, and in Valley clay sooner; the fix is to cut out and repour a section that never matches, or replace the whole thing. When a paver patio settles, or a plumber needs the sewer lateral under it, the fix is to lift the pavers, add base, compact and reset them, and the patch is invisible.

Our rule of thumb: if there is a mature tree, a sewer lateral or an irrigation main anywhere under the surface, pavers pay for themselves the first time anyone needs to get underneath. On a wide-open patio with nothing below it, concrete is the better value and we will say so. See the concrete patio cost guide and the concrete page.

Permits

A paver patio built at grade normally needs no building permit. The permit questions come from what goes with it: outdoor electrical and gas lines always need one, a patio cover usually does unless it is small and detached, and a retaining wall over 4 feet or carrying a surcharge does. Thresholds vary by city and we confirm the rules for your address.

Timeline

A paver patio takes one to two weeks on site: demolition and excavation the first day or two, base and compaction the next two or three, then laying, cutting, edging and joint sand. Curves and multi-size patterns push toward two weeks; a straight running-bond patio with good access can be done in one. In a larger build it goes in after grading, drainage, sleeves and footings and before the cover or planting, per the sequence on our outdoor living page.

Maintenance

Concrete pavers need very little. Expect some white efflorescence in the first year, especially in shade or where irrigation reaches; it is minerals leaving the concrete, it is normal and it washes out. Top up joint sand every few years where it has washed out or been carried off by ants. Sealing is optional on concrete pavers and recommended on natural stone. Keep spray irrigation off the surface; it is the most common reason edge pavers settle and stain.

Frequently asked questions

How much does a 400 square foot paver patio cost in Los Angeles?

At the site range of fifteen to twenty-five dollars or more per square foot installed, a 400 square foot patio in standard concrete pavers typically lands in the six to ten thousand dollar range before demolition. Porcelain or travertine pushes the top end well past that, an existing slab that has to be broken out and hauled away is a separate line item, and difficult access adds more.

Why are paver bids so different from each other?

Usually base depth and what is left out. A bid that excavates 2 inches and skips the edge restraint and the plate compactor is cheaper because it is a different product, and it will settle within a few years. Ask every bidder for base depth, compaction method, edge restraint and whether demolition and joint sand are included. Bids that answer those the same way will be close.

Do pavers cost more than concrete in the long run?

Usually less. Pavers cost more to install than poured concrete but can be lifted and reset when a root heaves them or a pipe underneath needs work. Concrete has to be cut out and patched, and the patch never matches. On a patio with trees or utilities beneath it, the first repair usually closes the gap; on a wide-open patio with nothing below, concrete stays the better value.

How deep does the base under a paver patio need to be?

For a patio, 4 to 6 inches of compacted aggregate base plus about an inch of bedding sand, placed in lifts and compacted with a plate compactor. On heavy clay, which covers much of the San Fernando Valley, we go deeper and often add a separation fabric so wet clay does not pump into the base. Driveways need more. Base depth is the first thing to check on a bid; it is where the money is saved when a price looks too good.

Do I need a permit for a paver patio?

Normally not for a patio at grade. Permits come into play for what is attached to it: outdoor electrical and gas lines always need one, a patio cover usually does unless it is small and detached, and a retaining wall over 4 feet or carrying a surcharge does. Some hillside lots have grading rules for larger excavations. We confirm the requirements for your address before work starts.

Should I seal my paver patio?

On concrete pavers it is optional; it deepens the color and makes stains easier to clean but has to be redone every few years. On travertine and other natural stone we recommend it, because the stone is porous. Either way, wait until the first year’s efflorescence has washed out before sealing, or you seal the haze in, and never seal a damp surface.

If you are weighing pavers against concrete or want a real number for your yard, contact us for a free site visit. We measure, check access and any existing slab, and send a written proposal within 48 hours.

Request Your Free Estimate

Call Free Estimate