Category: Kitchen Remodel

Get helpful advice on kitchen remodeling costs, layouts, materials, planning, and construction. Learn how to avoid common mistakes and make informed decisions before transforming your kitchen.

  • Do You Need a Permit to Remodel a Kitchen in Los Angeles?

    Do You Need a Permit to Remodel a Kitchen in Los Angeles?

    Yes, if the kitchen remodel touches plumbing, electrical circuits, gas, a wall, a window or the range-hood duct; no, if it is limited to paint, cabinets in the same place, countertops, backsplash and floor coverings. In the City of Los Angeles a kitchen remodel with no structural changes is an express permit issued online without plan check, while removing a wall or enlarging a window sends the plans to the Los Angeles Department of Building and Safety (LADBS) for review. Green Design and Build is a licensed general contractor (CSLB #1110975) based in Van Nuys that pulls the permits and schedules the inspections on every kitchen we build, serving homeowners across Los Angeles County, Orange County, Ventura County, western Riverside County and western San Bernardino County (Ontario, Rancho Cucamonga and neighbouring cities).

    We are led by Dekel Sofer. The company has completed hundreds of projects and holds a 4.7-star rating across 146 reviews on Yelp.

    What needs a permit and what does not (City of Los Angeles)

    The Los Angeles Building Code exempts “painting, papering and similar work” and “cases, counters and partitions, not over 5 feet 9 inches high” from a building permit (LAMC section 91.106.2), and the same code says a building permit does not relieve the owner of permits required under any other code, which is where plumbing, electrical and mechanical work come in. Los Angeles County’s exempt list for unincorporated areas says it more plainly: “painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work” need no building permit, but “separate plumbing, electrical, and mechanical permits may still be required.”

    Kitchen work Permit in the City of Los Angeles? Path
    Paint, wallpaper, backsplash tile No
    Cabinets replaced in the same location, refacing No building permit
    Countertops No
    Flooring (tile, LVP, hardwood) No building permit
    Faucet, sink or dishwasher swapped in the same spot Yes, plumbing (express) Online, no plan check
    Light fixture swapped in the same box No: LAMC section 93.0202 exempts like-kind fixture replacement in a single-family dwelling
    New circuits: counter receptacles, dishwasher, disposal, microwave, range Yes, electrical (express, no structural change) Online
    Panel upgrade (100 to 200 amps) Yes, electrical (express up to 400 amps in an existing residence) Online, plus utility coordination
    Moving the sink, dishwasher or refrigerator water line; new drain or vent Yes, plumbing Online with the combined remodel permit
    New or extended gas line to a range or cooktop Yes, plumbing (gas) Online, pressure test at inspection
    New range hood ducted through the roof or wall Yes, mechanical Online
    Kitchen remodel, layout changes, no structural change Yes, combined building/electrical/plumbing/mechanical Express permit, no plan check
    Removing or opening a wall, adding a beam Yes, building Plan check (counter plan check for a single-family alteration)
    Enlarging a window or door opening Yes, building Plan check; same-size change-out is express

    The line that matters is between “no structural changes” and everything else. LADBS Information Bulletin P/GI 2026-003, effective January 1, 2026, lists “Kitchen/bathroom remodel for residential buildings (no structural changes)” as an express building permit, along with “Replacing plumbing fixtures,” “Adding plumbing fixtures,” “Low pressure gas piping systems with up to 10 outlets,” electrical work up to 400 amps in an existing residence, and exhaust fans up to 2,000 cfm. Take out a wall or cut a bigger window and none of that applies.

    Two practical notes. A faucet swapped for a faucet is technically a plumbing fixture replacement and the city issues an express permit for it; most homeowners do not pull one for a faucet alone, but once the job includes anything else on the list the combined permit covers it. And cabinets need no building permit, but the outlets, under-cabinet lighting and hood that come with new cabinets almost always do, so a cabinet-only remodel that stays permit-free is rarer than it sounds. Our kitchen remodeling page describes what each tier of remodel includes.

    Express permit or plan check?

    LADBS has three doors. An express permit is issued online, usually the same day and at most about a week, for the work in the bulletin above; no drawings are reviewed, and the inspector checks the work against code in the field. Counter plan check is a same-day review at the Metro, Van Nuys, West LA, South LA or San Pedro office for “small and medium size projects that can be reviewed in approximately 45 to 60 minutes,” and LADBS lists “alteration to a single family dwelling or duplex” as eligible, which is where most kitchen wall removals with an engineered beam land. Regular plan check is for larger and more complex projects; LADBS says plans are returned “within weeks depending on workload,” and paying 50 percent more than the plan check fee expedites the review.

    For a kitchen: same-layout remodel, express, about a week at most; wall removal with a beam, an engineer’s drawings and calculations plus counter plan check, one to a few weeks depending on corrections; wall removal in a two-story or hillside house or a Historic Preservation Overlay Zone, expect regular plan check and, in an HPOZ, Office of Historic Resources sign-off first. Our post on removing a load-bearing wall covers the engineering side, and our load-bearing wall removal cost guide covers the budget.

    The inspection sequence

    Anything that gets covered up needs an inspection before it is covered, and every permit ends in a final. On a typical Los Angeles kitchen:

    1. Demolition and framing. If a wall came out or a beam went in, the inspector sees the beam, posts, hangers, hold-downs and any new footing before drywall. Footings are inspected before concrete is poured.
    2. Rough plumbing, electrical and mechanical. New drain, vent and water lines under pressure test, gas piping under an air test, every new circuit in its box, and the hood duct run, all with the walls open.
    3. Insulation and drywall. Opened exterior walls get insulation checked; some inspectors want to see drywall nailing before tape.
    4. Final. Fixtures set, GFCI and AFCI protection working, two 20-amp small-appliance circuits serving the counters with no point along the counter more than 24 inches from a receptacle, hood ducted outside with metal duct, high-efficacy lighting, water-conserving fixtures in place, and the retrofit items below done.

    Pasadena’s kitchen handout, which follows the same state codes, says it in one line: “a minimum of two inspections are required for kitchen remodels,” rough and final. We schedule them; nobody closes a wall before the rough inspection is signed.

    The retrofit items that ride along with a Los Angeles permit

    A kitchen permit in the City of Los Angeles pulls in requirements that have nothing to do with the kitchen. Under LAMC section 122.03, any permit over $500 on a house or duplex requires water-conserving fixtures throughout the house, and California Civil Code section 1101.4 separately requires any alteration to a pre-1994 single-family home to replace noncompliant toilets (over 1.6 gallons per flush), showerheads (over 2.5 gallons per minute) and faucets (over 2.2 gallons per minute) as a condition of final approval. Over $1,000 in valuation, smoke detectors are required in bedrooms and hallways (LABC section 91.8603.2); over $10,000, sliding and shower doors must be tempered or retrofitted with safety film (LABC section 91.2406.7) and a seismic gas shut-off valve is required at the meter (Ordinance 171,874). Almost every kitchen remodel crosses the $10,000 line.

    What a kitchen permit costs

    LADBS building, electrical, plumbing and mechanical fees are set by the city’s fee schedule and scale with the valuation and the number of fixtures and circuits; they are a small fraction of the project, and we list them as their own line on every proposal. The larger cost of the permit is the work it makes you do right: the second small-appliance circuit, the metal hood duct, the pressure-tested gas line. For context, a same-layout cosmetic kitchen in Los Angeles typically runs $25,000 to $40,000, a mid-range same-layout remodel $40,000 to $70,000, and a full remodel with layout, plumbing, electrical and structural changes $70,000 to $100,000 or more; a 100-to-200-amp panel upgrade is about $6,000 to $8,000. These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit. Our kitchen remodel cost guide breaks those tiers down, and on a pre-1980 house we recommend holding 15 to 20 percent of the budget as a contingency for what the walls hide.

    What happens to an unpermitted kitchen when you sell

    Three things. First, California’s Real Estate Transfer Disclosure Statement (Civil Code section 1102.6) asks the seller, under item II.C.4, whether they are aware of “room additions, structural modifications, or other alterations or repairs made without necessary permits,” and under item 5 whether any were “not in compliance with building codes.” A remodeled kitchen with no permit on file is a yes, and a yes invites a price negotiation or an inspection contingency. Second, since July 1, 2024, a seller who bought within the previous 18 months must disclose every alteration made since purchase, name the contractors and provide the permits (AB 968). Third, if LADBS learns of the work, the current owner pays an investigation fee of double the permit fee, with a $400 minimum (LAMC section 98.0402), then opens the walls so an inspector can see the plumbing, wiring and any beam. The people who pay for unpermitted kitchens are the ones who buy them.

    Other cities run their own building departments

    LADBS covers the City of Los Angeles, which includes Van Nuys, Sherman Oaks, Encino, Studio City, Woodland Hills, Northridge and North Hollywood; unincorporated areas use Los Angeles County Building and Safety. Every other city in the five counties runs its own building division under the same California codes, with its own forms, fees and thresholds, and the thresholds are not identical:

    • Pasadena requires a permit for “removal and replacement and/or relocation of kitchen cabinets and countertops, sink, dishwasher, new/altered island, or replacement/alteration to the electrical and exhaust hood,” and exempts only “kitchen countertop replacement or re-facing of existing cabinets.” A cabinet swap that is permit-free in Los Angeles is not in Pasadena.
    • Burbank reviews “new construction, additions, and remodels” through its Building Division; electronic submittal is through ProjectDox, and the city says a first plan-check review “can take up to eight weeks.” Plan on that for a wall removal.
    • Irvine issues same-day online permits for eligible no-plan-check work through its Building and Safety Division’s PermitsDIRECT system, and reviews structural changes through plan check.
    • Rancho Cucamonga runs its permits 100 percent online through Building and Safety Services, with next-day inspections.
    • Glendale, Santa Clarita, Anaheim and Ontario each run their own building divisions; check the city’s handout before assuming the Los Angeles list applies.

    The rule that travels: cosmetic finishes are permit-free almost everywhere, anything with a pipe, a wire, a flame or a beam is not, and the city’s own handout is the only list that counts.

    How long does a kitchen permit take?

    Step Typical duration
    Express permit (no structural change) About one week, sometimes same day
    Counter plan check for a wall removal (engineer’s drawings ready) Same-day review; corrections can add one to two weeks
    Full permit with structural, plumbing and electrical changes Two to six weeks
    Construction, same-layout remodel Four to eight weeks
    Construction, layout or structural changes Eight to twelve weeks

    Add three to six weeks of design and selections before the permit, and about three weeks for custom cabinets to be manufactured, which usually overlaps with permitting. A same-layout kitchen is roughly a three-month project door to door; a full remodel with a wall removal runs four to six months.

    A 1960s Valley kitchen that needed more permit than planned

    A homeowner in a 1960s house planned a kitchen remodel that, on paper, would have been an express permit. Demolition found three things: the original electrical panel could not safely carry the planned appliances, the old cast-iron drain had to be replaced, and the wall the owners wanted moved was load-bearing and needed a structural engineer and a beam. The beam took the job from express to plan check, and the discoveries added about three weeks and costs the owners had not budgeted. We retold that project in what I wish I knew before remodeling my kitchen, and it is typical of 1960s Valley ranch houses, where the original panel and plumbing rarely survive a full kitchen remodel. Our Torrance open-plan kitchen shows the plan-check version done on purpose: an engineer sized a beam to replace the load-bearing wall between kitchen and dining room, temporary shoring carried the load while the beam went in, and rough electrical for the island and lighting was inspected before drywall.

    Where we do this work

    We pull kitchen permits and build kitchens from our Van Nuys office across the San Fernando Valley, the rest of Los Angeles County, Orange County, Ventura County, western Riverside County and western San Bernardino County. The permit office changes at every city line: LADBS in the City of Los Angeles, the county in unincorporated areas, Burbank, Glendale, Pasadena and Santa Clarita’s own divisions next door, Ventura County Building and Safety or the city halls of Thousand Oaks, Simi Valley and Oxnard to the west, each Orange County city to the south, and county or city departments in Riverside and San Bernardino. Master-planned Orange County communities add HOA review for anything that changes a window or exterior vent, and HPOZ neighborhoods in Los Angeles add the Office of Historic Resources. See all of our service areas.

    Kitchen permit FAQs

    Do you need a permit to remodel a kitchen in Los Angeles?

    Yes, if the remodel touches plumbing, electrical circuits, gas, a wall, a window or the range-hood duct, and no if it is limited to paint, cabinets in the same place, countertops, backsplash and flooring. In the City of Los Angeles a kitchen remodel with no structural changes is an express permit issued online without plan check under LADBS Information Bulletin P/GI 2026-003; removing a wall or enlarging an opening requires plan check.

    Do I need a permit to replace kitchen cabinets and countertops?

    Not in the City of Los Angeles, where cabinets in the same location, countertops and refacing are finish work with no building permit, and not in unincorporated Los Angeles County, whose exempt list names “cabinets, counter tops, and similar finish work.” Pasadena is stricter and requires a permit for removal and replacement of cabinets. The outlets, under-cabinet lighting and hood that usually come with new cabinets do need electrical and mechanical permits.

    What is an LADBS express permit?

    An LADBS express permit is a building, electrical, plumbing or mechanical permit issued online without plan review for work listed in Information Bulletin P/GI 2026-003, including a residential kitchen or bathroom remodel with no structural changes, replacing or adding plumbing fixtures, gas piping up to 10 outlets, electrical work up to 400 amps in an existing residence, and exhaust fans up to 2,000 cfm. The inspector checks the work in the field instead of reviewing drawings first.

    How long does a kitchen permit take in Los Angeles?

    An express permit for a same-layout kitchen in the City of Los Angeles takes about a week and is sometimes issued the same day. A kitchen with a wall removal needs an engineer’s drawings and plan check; counter plan check reviews a single-family alteration the same day in roughly 45 to 60 minutes, and a full permit with structural, plumbing and electrical changes typically takes two to six weeks including corrections.

    What happens if I remodel my kitchen without a permit?

    If LADBS finds out, the owner pays an investigation fee of double the permit fee with a $400 minimum, then opens finished walls so the wiring, plumbing and any beam can be inspected before the permit is finalized. When the house sells, the Transfer Disclosure Statement asks whether any alterations were made without permits, and since July 2024 a seller who has owned the house less than 18 months must list every alteration, the contractors and the permits. Unpermitted structural work can also stop a lender or appraiser from counting the space.

    Does a kitchen permit require other upgrades to the house?

    In the City of Los Angeles, yes. A permit over $500 requires water-conserving fixtures throughout the house, a permit over $1,000 requires smoke detectors in bedrooms and hallways, and a permit over $10,000 requires tempered or film-retrofitted sliding and shower doors and a seismic gas shut-off valve. California Civil Code section 1101.4 separately requires pre-1994 single-family homes to replace noncompliant toilets, showerheads and faucets as a condition of final approval on any alteration permit.

    Get a kitchen proposal with the permit already figured out

    We will tell you at the site visit whether your kitchen is an express permit or plan check, what the rough inspection will want to see, and which retrofit items your house still needs, and put the permit and inspections on the proposal as their own lines. The site visit and the estimate are free.

  • How Much Does a Kitchen Remodel Cost in Los Angeles?

    How Much Does a Kitchen Remodel Cost in Los Angeles?

    A kitchen remodel in Los Angeles typically costs $25,000 to $100,000 or more: roughly $25,000 to $40,000 for a cosmetic refresh in the existing layout, $40,000 to $70,000 for a mid-range remodel that replaces everything but keeps the layout, and $70,000 to $100,000 or more when walls, plumbing and electrical move. Green Design and Build is a licensed general contractor (CSLB #1110975) based in Van Nuys that designs, permits and builds kitchen remodels for homeowners across Los Angeles County, Orange County, Ventura County, western Riverside County and western San Bernardino County. The figures on this page are typical Los Angeles budgeting ranges, not a quote; the number for your kitchen depends on the house, the scope and the finishes you choose.

    We are led by Dekel Sofer; the company has completed hundreds of projects and holds a 4.7-star rating across 146 reviews on Yelp.

    Kitchen remodel cost by scope

    Scope drives the price more than any single finish does. The table groups the three kinds of kitchen remodel we see most often in Los Angeles, assuming a typical single-family kitchen of roughly 150 to 250 square feet, permits where required, and a licensed general contractor managing the trades.

    Scope Typical Los Angeles range What is usually included
    Cosmetic refresh, same layout $25,000 to $40,000 Stock or semi-custom cabinets in the existing footprint, or refacing; new countertops and backsplash; sink and faucet; paint; new lighting in existing locations; appliances swapped in place. Nothing moves.
    Mid-range remodel, same layout $40,000 to $70,000 Semi-custom or custom cabinets; quartz or stone countertops; new flooring; recessed and under-cabinet lighting; counter electrical brought to current code; new plumbing fixtures and supply lines; range hood ducted outside. Layout stays.
    Full remodel with layout, plumbing and electrical changes $70,000 to $100,000 or more Everything above plus removing or opening a wall (often with a beam and engineering), relocating the sink, range or dishwasher, new drain and water lines, new circuits or a panel upgrade, an island with power, custom cabinetry built to the new plan.

    How we estimated these numbers

    The ranges on this page are budgeting estimates for Southern California, not a price list. They are drawn from Green Design and Build’s own written proposals and completed projects across Los Angeles, Orange, Ventura and western Riverside and San Bernardino counties, checked against current supplier and subcontractor pricing. A real project can come in lower or higher depending on the house, the scope and the finishes. Reviewed by Dekel Sofer, licensed general contractor (CSLB #1110975), September 2026. Publishers and journalists are welcome to cite these figures with a link to this page.

    The bands overlap on purpose: a same-layout kitchen with custom cabinets, a 48-inch range and slab marble can cost more than a modest layout change with semi-custom boxes. And the floor of the first tier is real; once a permitted job has a crew, a dumpster, cabinets, counters and an electrician in it, there is little room under $25,000 without leaving something out. Our guide to what a Los Angeles general contractor costs puts full kitchen remodels in the same $30,000 to $100,000-plus band.

    What changes the price of a kitchen remodel

    Two kitchens with the same square footage can land $40,000 apart, and when they do it is almost always one of the five items below.

    Whether the layout changes

    Keeping the sink, range and refrigerator where they are keeps the drain, the gas line and most of the electrical where they are, and that is the biggest cost lever you control. Moving the sink to an island on a slab-foundation house means cutting the slab for a new drain and vent; on a raised foundation it is easier, but it is still new plumbing that is permitted and inspected. Moving a range means a new gas line or a 240-volt circuit for induction.

    Removing a wall

    Opening the wall between the kitchen and the dining room is one of the most requested remodels we see in 1950s to 1970s San Fernando Valley ranch houses, and it is the change that turns a mid-range kitchen into a full remodel. If the wall is load-bearing, the job needs a structural engineer, a beam sized for the span, posts and footings to carry it, and a plan-check permit rather than an express permit; our guide to removing a load-bearing wall walks through how that is determined and what it involves. If it is not bearing, it is a day of demolition and some drywall. You cannot tell which you have from the paint side, so we do not price the wall until we have looked in the attic and at the framing.

    Cabinets and finishes

    Cabinets are usually the largest single line in a kitchen and the widest range; stock, semi-custom and full custom cabinetry can differ by tens of thousands of dollars in the same room. Custom cabinets take about three weeks to manufacture once the drawings are approved, so they also set the schedule. Spend on box construction, drawer slides and hinges, which cannot be changed later; save on door hardware and pendant lights, which can. Countertops are the other swing item: the choice between quartz, granite, marble or porcelain slab can move a quote $5,000 to $15,000 inside the same tier, which is why every selection is made before demolition, not during it.

    The condition of the house

    Pre-1980 houses hide the costs that were never in the first bid: a 100-amp panel with no room for new circuits, galvanized supply lines, cast-iron drains, a slab that is not level, and framing notched by three previous owners. We recommend holding 15 to 20 percent of the budget as a contingency on an older home, meaning money that stays unspent until the walls are open. If the panel does need to go from 100 amps to 200 amps, the ADU cost guide on this site puts that upgrade at $6,000 to $8,000, the utility coordination can add weeks, and our electrical panel upgrade cost guide explains when a 200-amp service is actually needed.

    Permits, engineering and who pulls them

    A same-layout kitchen can go through the express permit system in the City of Los Angeles; a kitchen that moves walls or runs new plumbing and electrical inside them needs a full permit with plans, and a beam needs engineering. A quote that leaves out the permit, the engineering and the inspections is not cheaper; it has moved the cost to later, and sometimes onto you.

    Do you need a permit to remodel a kitchen in Los Angeles?

    In the City of Los Angeles, which includes Van Nuys, Sherman Oaks, Encino, Studio City, Woodland Hills, Northridge and North Hollywood, permits are issued by LADBS. Painting, refacing cabinets and setting new countertops on existing cabinets do not by themselves trigger a building permit; most real kitchen remodels do, because they touch plumbing, electrical or a wall.

    LADBS lists “remodeling kitchens or bathrooms” among the projects eligible for its Express Permit (e-permit) system. The kitchen e-permit covers repairing or replacing cabinets, flooring, wall finishes, tile, counters and plumbing and electrical fixtures only; it does not allow changes to walls or openings, or new plumbing or electrical run into an existing wall. Anything beyond that, which means most layout changes, new circuits, a relocated sink or a removed wall, needs permits issued through an LADBS Construction Services Center with plans and usually a plan check. An e-permit kitchen normally gets one inspection at the end; a full remodel gets rough plumbing, rough electrical, framing and drywall inspections before the final.

    Three code items catch homeowners by surprise on a permitted kitchen anywhere in Southern California, because they come from the state codes every city adopts:

    • Electrical at the counters. The California Electrical Code requires at least two 20-amp small-appliance circuits for the counters, receptacles spaced so no point along the counter is more than 24 inches from an outlet, and GFCI protection for every countertop receptacle and any receptacle within six feet of the sink. Under the current code the dishwasher circuit needs GFCI protection too, and major appliances get dedicated circuits. A 1960s kitchen with two ungrounded outlets meets none of this, and once the permit is open the counters are brought up to code.
    • Title 24 lighting. Under the 2022 California Energy Code, kitchen lighting that is added or altered must be high-efficacy, which in practice means JA8-certified LED fixtures on a dimmer or vacancy sensor, with under-cabinet lighting switched separately from the ceiling lights. Only the work covered by the permit has to comply; the rest of the house is not affected.
    • Ventilation. The energy code, through ASHRAE 62.2, expects a kitchen exhaust fan vented to the outdoors, with a 100 cfm minimum for a range hood. If the existing hood recirculates into a cabinet, part of the job is a duct through the roof or an exterior wall.

    Two more items for older houses. If the house was built before 1978, a paid contractor disturbing painted surfaces must be EPA Lead-Safe certified and follow lead-safe work practices under the federal Renovation, Repair and Painting rule, which covers most of the Valley’s housing stock. And before demolition on a pre-1980 kitchen we test vinyl floor tile, mastic and textured ceilings for asbestos, because abatement is a separate, regulated line item and it is cheaper to know before the crew starts.

    How long does a kitchen remodel take?

    Stage Typical time
    Site visit, measurements, written estimate About a week
    Design, 3D rendering and all selections approved Three to six weeks
    Cabinet manufacturing (custom) About three weeks, ordered as soon as drawings are approved
    Permit: e-permit for a same-layout remodel About one week, sometimes same day
    Permit: plan check for structural or new plumbing and electrical Two to six weeks
    Construction: same-layout remodel Four to eight weeks
    Construction: layout or structural changes Eight to twelve weeks

    These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit.

    From the first meeting to a working kitchen, most same-layout remodels in Los Angeles run about three months and a full remodel with a wall removal runs four to six months, with design and permitting taking about as long as the build. Two things protect that schedule: we produce a 3D rendering and get every selection approved before demolition, so the cabinets are in production when the old kitchen comes out, and we build the inspection days into the schedule rather than around them.

    A real kitchen remodel that changed how we prepare clients

    In what we wish every homeowner knew before remodeling a kitchen, we describe a family in a house built around 1960 who came to us with a clear plan: open the kitchen to the dining room, new cabinets, counters and appliances. The budget was built around what they could see. Demolition showed three things they could not: an original electrical panel that could not safely carry the planned appliances, original cast-iron drains that had to be replaced, and a wall that turned out to be load-bearing, which meant a structural engineer, a beam and a permit revision. Those discoveries added roughly three weeks and costs the family had not budgeted. Their words afterward: “I wish I had understood how much the unseen stuff would drive the budget and the timeline.” That project is why we check the attic and crawlspace of every pre-1980 kitchen before we write a number, and why we tell homeowners to keep the 15 to 20 percent contingency in reserve rather than spending it on upgrades on day one.

    The opposite lesson comes from a kitchen that was not ours. In our guide to hiring a general contractor without getting scammed, a homeowner collected three bids for a complete kitchen. Two came in near $45,000. The third was $28,000, on a one-page contract that read, in full, “Remodel kitchen, cabinets, countertops, flooring, electrical — $28,000,” with 60 percent, $16,800, due up front. Demolition happened fast; then the crew showed up one day in five. Two verbal change orders followed, $4,000 for a panel upgrade and $3,500 for water-damaged subfloor. At roughly 60 percent complete, with cabinet boxes and no doors, no countertops ordered and electrical never inspected, the contractor disappeared. The homeowner had paid about $24,000, no electrical permit had been pulled, and the licence number on the contract was an expired plumbing licence, not a general building licence. She paid a second contractor to finish, plus permits, inspections and electrical corrections. The $28,000 kitchen was a $45,000 kitchen with the scope, the permit and the contingency removed from the paper.

    How to compare kitchen remodel quotes

    Get every bid to answer the same six questions in writing. Where the answers differ, that is where the price difference lives.

    1. Cabinets. Brand or shop, box construction (plywood or particleboard), door style, finish, and whether drawings and installation are included.
    2. Countertops and tile. Material, slab or prefabricated, edge profile, and the allowance if the slab has not been picked.
    3. Plumbing and electrical. Whether the sink, range or dishwasher move; the number of new circuits; whether the panel is included; whether the counters are brought to current GFCI and circuit requirements. On our projects this work is performed by licensed plumbers and electricians and scheduled and supervised by us as your general contractor.
    4. Structural. If a wall comes out, whether engineering, the beam, posts and footings are in the price or “to be determined.”
    5. Permits and inspections. Who pulls the permit, whether fees and plan check are included, and how many inspections are planned.
    6. Payment terms and change orders. Under California law the down payment on a home improvement contract cannot exceed $1,000 or 10 percent of the contract price, whichever is less, and every change in scope or price should be a signed written change order before the work happens.

    A quote with a single line and a big deposit is not a lower price; it is a missing scope. Read more on the kitchen remodeling service page, or, if the kitchen is part of a larger plan, see room additions and whole-home renovation.

    Where we build kitchens

    We remodel kitchens from our Van Nuys office across the San Fernando Valley, the rest of Los Angeles County, Orange County, Ventura County and western Riverside County. The work is the same; the paperwork is not. Inside the City of Los Angeles, LADBS issues the permit, and in an HPOZ historic district exterior changes such as a new vent or window go through the Office of Historic Resources first. Burbank, Glendale, Pasadena, Santa Clarita, Long Beach, Torrance and every Orange County city run their own building divisions; HOA review in Orange County master-planned communities rarely touches an interior kitchen unless a window or exterior vent changes. Ventura County Building and Safety covers unincorporated areas, with Thousand Oaks, Simi Valley, Oxnard, Ventura and Camarillo issuing their own permits, and Corona, Riverside, Murrieta and Eastvale each have their own building department. The Valley’s 1950s to 1970s ranch houses almost always need electrical and plumbing brought up to code, while newer Orange County and Riverside tracts usually have the panel capacity and copper plumbing already. See all of our service areas.

    Kitchen remodel cost FAQs

    How much does a kitchen remodel cost in Los Angeles?

    A kitchen remodel in Los Angeles typically costs $25,000 to $100,000 or more. A cosmetic refresh in the existing layout runs about $25,000 to $40,000, a mid-range remodel that replaces cabinets, counters, flooring and lighting without moving anything runs $40,000 to $70,000, and a full remodel with layout, plumbing and electrical changes runs $70,000 to $100,000 or more. These are typical Los Angeles budgeting ranges, not a quote.

    What is the cheapest way to remodel a kitchen?

    The cheapest kitchen remodel keeps the sink, range and refrigerator where they are, because that keeps the drain, gas line and most of the electrical in place. Refacing or replacing cabinets in the same footprint, new countertops, a tile backsplash and new lighting in the existing locations usually fits the $25,000 to $40,000 tier in Los Angeles. Moving plumbing or removing a wall is what pushes a kitchen into the higher tiers.

    Do I need a permit to remodel my kitchen in Los Angeles?

    Usually, yes. In the City of Los Angeles, LADBS offers an express e-permit for a kitchen remodel that only replaces cabinets, flooring, finishes, counters and plumbing and electrical fixtures in place. If the remodel changes walls or openings, or runs new plumbing or electrical into the walls, it needs full permits through an LADBS Construction Services Center, and a removed load-bearing wall needs engineering. Other cities follow the same state codes with their own permit processes.

    How long does a kitchen remodel take?

    A same-layout kitchen remodel in Los Angeles usually takes four to eight weeks of construction, and a remodel with layout or structural changes takes eight to twelve weeks. Add three to six weeks for design and selections and one to six weeks for permits, so most same-layout kitchens run about three months from the first meeting and full remodels four to six months. Custom cabinets take about three weeks to manufacture, so we order them before demolition.

    How much does it cost to remove a wall between the kitchen and dining room?

    Removing the wall between the kitchen and dining room is what moves a kitchen from the mid-range tier into the $70,000 to $100,000-plus full remodel tier in Los Angeles, because a load-bearing wall needs a structural engineer, a beam, posts and footings, and a plan-check permit. If the wall is not bearing the cost is much lower, but that cannot be confirmed from the finished side, so we inspect the attic and framing before pricing it.

    How much should I set aside for surprises in an older home?

    For a kitchen in a home built before 1980, keep 15 to 20 percent of the budget as a contingency that stays unspent until the walls are open. The common surprises in Los Angeles are an undersized electrical panel, cast-iron or galvanized plumbing, an out-of-level slab and a wall that turns out to be load-bearing. A 100-amp to 200-amp panel upgrade alone typically runs $6,000 to $8,000 and can add weeks of utility coordination.

    Get a written kitchen remodel price for your house

    We will measure the kitchen, look at the panel, the plumbing and the framing before we write a number, and give you an itemized proposal that lists the cabinets, counters, electrical, plumbing, structural work and permits line by line. The site visit and the estimate are free.

  • What Do I Wish I Knew Before Remodeling My Kitchen?

    What Do I Wish I Knew Before Remodeling My Kitchen?

    A kitchen remodel can completely change the way a home looks, feels, and functions. It can create more storage, improve the flow of the house, increase property value, and make everyday routines more enjoyable.

    But it can also be one of the most disruptive projects a homeowner takes on.

    After working with homeowners through kitchen remodels, the biggest regrets usually are not about choosing the wrong cabinet color or backsplash tile. They come from decisions made before construction began—or decisions that were not made at all.

    Homeowners often focus on what the finished kitchen will look like. They picture the new island, countertops, appliances, and lighting. What they do not always picture is what could be hiding behind the walls, how long they may be without a functioning kitchen, or how one small change can affect several other parts of the project.

    Here is what we wish every homeowner understood before remodeling a kitchen.

    Budget for the House You Have, Not Just the Kitchen You Want

    The biggest budgeting mistake is planning for the kitchen someone wants without accounting for the condition of the house they already own.

    A homeowner might search online, find an average kitchen remodeling cost, and build an entire budget around that number. The problem is that an online average does not know the age of your electrical panel, the condition of your plumbing, whether a wall is load-bearing, or what is underneath your existing flooring.

    Older homes especially can contain surprises such as:

    • Outdated electrical wiring or an undersized electrical panel
    • Old cast-iron, galvanized, or deteriorated plumbing
    • Water damage or hidden leaks
    • Uneven floors
    • Improper work completed by a previous owner
    • Asbestos-containing materials
    • Structural framing that needs reinforcement
    • Walls that appear nonstructural but are actually load-bearing

    None of those items may appear in the final photos, but they can take up a meaningful part of the remodeling budget.

    Homeowners naturally want to spend their money on the visible parts of the kitchen. They want beautiful cabinets, countertops, flooring, appliances, and fixtures. However, the invisible work is often what protects the home and allows the new kitchen to function properly.

    Plumbing, electrical, framing, engineering, waterproofing, ventilation, and permits may not be exciting purchases, but ignoring them can create expensive problems later.

    Our guide to kitchen remodel cost in Los Angeles gives the ranges we use for budgeting.

    A Real Kitchen Remodel That Changed How We Prepare Clients

    A few years ago, we worked with a couple we will call the Andersons. They owned an older home built around the 1960s. The house had great bones, but like many homes from that period, much of what was behind the walls was unknown.

    The Andersons had a beautiful plan for their kitchen. They wanted a waterfall quartz island, a sink relocated beneath the window, and a wall removed to create a more open connection between the kitchen and dining room.

    The design was attractive, and the changes were possible. The challenge was what we discovered after opening the walls.

    The existing electrical panel was original to the home and could not safely support the load from the planned appliances. Some of the old cast-iron plumbing needed to be replaced. The wall they wanted to relocate also turned out to be load-bearing, which meant the project needed structural engineering and a beam.

    These were not issues that someone had intentionally overlooked. You genuinely cannot confirm every concealed condition until demolition begins. However, the discoveries added approximately three weeks to the project and created costs the homeowners had not originally budgeted for.

    After the remodel, one of the homeowners told me, almost word for word, “I wish I had understood how much the unseen stuff would drive the budget and the timeline.”

    That statement describes one of the most important realities of remodeling.

    The finished kitchen is what everyone sees. The hidden conditions are often what determine how smoothly the project gets there.

    An electrical panel upgrade is the most common surprise in these projects; our electrical page explains when it is required.

    That story is typical of 1960s Valley ranch houses, where the original panel and plumbing rarely survive a full kitchen remodel.

    Build a Real Contingency Into the Budget and Timeline

    For an older home, we generally recommend setting aside approximately 15% to 20% of the project budget for unforeseen conditions.

    That contingency should be treated as a real part of the budget—not money the homeowner has mentally spent on additional upgrades before construction even starts.

    For example, if unexpected plumbing or electrical work is discovered, the contingency gives the homeowner room to address it properly without panicking or sacrificing an essential part of the project.

    If the contingency is not needed, that is great. The homeowner finishes under budget or has funds available for optional upgrades near the end. If it is needed, the project can continue without every surprise becoming a financial emergency.

    Time should be treated the same way.

    A construction schedule is important, but it should not be so tight that one inspection delay, material backorder, or hidden condition causes the entire plan to collapse. Homeowners should prepare for a realistic completion range rather than focusing only on the most optimistic possible date.

    Before hiring a contractor, ask directly:

    “What is your process when you find something unexpected?”

    A qualified contractor should be able to explain how concealed conditions are documented, priced, communicated, and approved. The answer should not be, “We will figure it out when it happens.”

    Do Not Rush the Decisions That Are Expensive to Change

    Homeowners often spend their decision-making energy in the reverse order of what matters most.

    They may agonize over cabinet colors for weeks but approve the kitchen layout in one meeting. They may spend hours selecting a pendant light without fully considering whether there will be enough light over the counters.

    The decisions that deserve the most attention are the ones that will be buried inside the walls or built permanently into the room.

    Get the Layout Right Before Choosing Finishes

    The layout affects how the kitchen functions every single day.

    A large island may look impressive in a rendering, but it can make the room uncomfortable if there is not enough clearance around it. As a general planning guideline, approximately 42 inches of walkway space may be appropriate in many kitchens, while closer to 48 inches can be more comfortable when multiple people cook or move through the area.

    Every kitchen is different, so the dimensions should be evaluated based on the actual space, appliance locations, cabinet doors, seating, and household habits.

    Homeowners should think beyond whether a layout looks balanced on paper. Consider questions such as:

    • Can the refrigerator doors open fully?
    • Can the dishwasher open without blocking the main walkway?
    • Is there enough room to stand at the sink while someone passes behind you?
    • Is the trash pullout near the main preparation area?
    • Can two people cook without constantly crossing paths?
    • Is there a convenient landing area beside the refrigerator and oven?
    • Will island seating interfere with circulation?

    A refrigerator placed far away from the sink and preparation space may look visually appealing in a drawing. In daily life, however, walking across the kitchen repeatedly with ingredients, dishes, and heavy pots can become frustrating.

    Once the flooring, cabinets, plumbing, electrical work, and drywall are complete, fixing a poor layout becomes very expensive.

    Plan Lighting in Layers

    Lighting is one of the most common quiet regrets in a kitchen remodel.

    Homeowners may choose attractive pendant lights over the island and assume the kitchen has been properly lit. Later, they discover they are standing in their own shadow while preparing food at the counter.

    A functional kitchen usually needs several types of lighting working together:

    • Ambient lighting for overall illumination
    • Task lighting over work surfaces
    • Under-cabinet lighting for countertop visibility
    • Decorative lighting for style and atmosphere
    • Accent lighting where appropriate

    The wiring, switch locations, dimmers, fixture boxes, and recessed-light placement should be planned before the walls are closed.

    Adding electrical wiring during construction is generally much easier than adding it after the kitchen is finished. Retrofitting lights later can mean opening drywall, using visible surface-mounted solutions, or settling for battery-operated fixtures that look like an afterthought.

    Decorative fixtures can be replaced later. The electrical plan behind them is much harder to change.

    Prioritize Cabinet Function Over Door Style

    Cabinet color and door style matter, but cabinet function will affect the homeowner much more frequently.

    Before ordering cabinets, consider how items will actually be stored.

    Deep drawers can make pots, pans, dishes, and small appliances easier to access than traditional lower cabinets with fixed shelves. A trash and recycling pullout can keep bins out of sight. Spice pullouts, tray dividers, appliance garages, pantry inserts, and corner solutions can make a major difference in everyday use.

    The cabinet boxes, hinges, drawer slides, and internal construction are also more important than many homeowners realize. Cabinet doors can sometimes be refinished or replaced later. Poor-quality cabinet boxes that sag, loosen, or fall out of alignment are much more difficult to correct.

    Confirm Appliance Specifications Before Cabinetry Is Built

    Many homeowners spend time researching appliance brands but overlook the installation specifications.

    Before cabinets are ordered or built, the project team should confirm:

    • Exact appliance dimensions
    • Required cabinet openings
    • Door and handle clearances
    • Ventilation requirements
    • Gas or electrical requirements
    • Water-line and drain locations
    • Manufacturer-required spacing
    • Whether the appliance can physically enter the house

    An appliance may technically fit within a cabinet opening but still have a door that cannot open fully because of a nearby wall or handle.

    Appliances should not simply be selected by general size. The exact model specifications need to be reviewed and coordinated with the cabinet, electrical, plumbing, and ventilation plans.

    Choose Finishes for the Way You Live

    Some materials photograph beautifully but require more maintenance than homeowners expect.

    Honed marble, for example, can create an elegant, high-end appearance. It can also etch when exposed to acidic foods such as lemon juice. For someone who enjoys the natural aging and patina of stone, that may be acceptable. For a busy household expecting the countertop to remain visually perfect, it may cause frustration.

    The right material is not always the most expensive one. It is the material that fits the homeowner’s lifestyle, maintenance expectations, cooking habits, children, pets, and tolerance for wear.

    Spend on What Is Disruptive to Replace

    The general rule is simple:

    Spend more on the features that are expensive or disruptive to change later. Save on the items that are easy to replace.

    Where I Recommend Spending

    Layout and structural work should be done correctly the first time. Moving walls, changing plumbing locations, or correcting poor circulation later may require opening the kitchen back up.

    Cabinet construction is another area where quality matters. Homeowners open and close their cabinets thousands of times. Good hinges, drawer slides, and cabinet boxes affect how the kitchen performs long after the initial excitement wears off.

    Countertops are also touched and used constantly. A durable, low-maintenance surface such as quartz can be a practical middle ground for many households.

    Plumbing and electrical work should never be treated as an area to cut corners. These systems affect safety, performance, inspections, and the long-term condition of the home.

    Where Homeowners May Be Able to Save

    Cabinet knobs and handles can be changed easily. There is no reason to damage the overall budget over hardware that can be upgraded later.

    Decorative pendant lights can also be swapped out as styles change. The important investment is proper wiring, placement, and switching.

    Backsplash tile can provide strong visual impact, but it may be an area where a more affordable option works well. It is also less disruptive to replace than countertops or cabinetry.

    Appliances do not always need to be top-of-the-line. For many homeowners, reputable mid-range appliances perform well and leave more room in the budget for permanent improvements. Appliances also have a limited lifespan regardless of how much they cost.

    Compare Contractor Scope, Not Just the Bottom-Line Price

    The person managing and performing the work can make the difference between a smooth remodel and a nightmare.

    I have seen beautiful designs fall apart because the wrong contractor was hired. I have also seen modest budgets produce excellent kitchens because the right person was coordinating the project.

    Homeowners should obtain multiple bids, but the goal is not simply to choose the lowest number.

    A lower bid may exclude items included in another contractor’s proposal. One estimate might include permits, demolition, debris removal, electrical upgrades, painting, finish materials, and final cleanup. Another may leave several of those items vague or completely excluded.

    The lowest initial price is not necessarily the lowest final price.

    Ask contractors to provide detailed scopes so the proposals can be compared as closely as possible.

    Verify the Contractor Before Signing

    A professional presentation is not enough. Homeowners should independently verify the contractor’s license and confirm that it is active and appropriate for the planned work.

    They should also request proof of general liability insurance and workers’ compensation coverage where required. Do not rely only on verbal assurances.

    Ask for references from projects completed at least a year ago. A recently completed kitchen may look excellent, but an older reference can tell you how the cabinets, finishes, and workmanship held up over time. It can also reveal whether the contractor returned to address warranty or punch-list items.

    Ask who will actually manage the project and be present at the home. Some companies send an experienced salesperson to secure the contract but rely on rotating subcontractors after construction begins.

    Homeowners should know:

    • Who the main point of contact will be
    • Who supervises the workers
    • How frequently the project manager visits
    • How updates will be provided
    • How concerns and change orders will be handled
    • Who is responsible for scheduling inspections
    • What warranty is provided for labor

    Watch for Contractor Red Flags

    Several warning signs should not be ignored.

    Pressure to sign immediately is one. A kitchen remodel is a major investment, and a reputable contractor should allow the homeowner to review the proposal and ask questions.

    A bid that is dramatically lower than every other bid should also be examined carefully. The difference may come from excluded work, cheaper materials, unqualified labor, missing permits, or a strategy of recovering money through change orders later.

    Other warning signs include:

    • Reluctance to provide a detailed written scope
    • Vague payment schedules
    • Large upfront payment demands
    • Refusal to discuss permits
    • Poor communication during the bidding process
    • No written labor warranty
    • No clear process for change orders
    • An unwillingness to provide references
    • Constantly criticizing previous clients or every competing contractor
    • Disorganized or unsafe job sites

    Poor communication before the contract is signed is especially important. The bidding stage is usually when a contractor is trying hardest to earn the homeowner’s business. If calls are already being ignored and questions are receiving vague answers, communication is unlikely to improve after a deposit has been paid.

    The paperwork and communication habits established before construction usually set the tone for the entire project.

    Make Every Major Decision Before Demolition

    The smoothest projects are not always the ones with the largest budgets. They are usually the projects where the homeowner and contractor completed the necessary planning before the first sledgehammer swing.

    Before demolition, homeowners should ideally have:

    • A final approved layout
    • Confirmed cabinet drawings
    • Appliances selected with specifications reviewed
    • Fixtures and finishes selected
    • Long-lead materials ordered
    • Permits approved
    • A written project schedule
    • A payment schedule tied to milestones
    • A documented process for changes
    • A temporary-kitchen plan

    Every change made during construction can affect other parts of the project.

    Moving an outlet may require electrical revisions and drywall repair. Changing the tile may create a delivery delay. Selecting a different appliance may require cabinet modifications, electrical changes, or a new ventilation plan.

    One small decision can create a chain reaction.

    Appliances and custom materials can also have long lead times. Some products may take several weeks or longer to arrive. When a required item is not available, the project may stop, or the contractor may need to move workers to another project while waiting.

    Once a crew has moved on, getting everyone back immediately may not be possible.

    Prepare for Life Without a Kitchen

    One of the things the Andersons mentioned after their remodel was that living through construction felt completely different from looking at a design board.

    Even a well-managed kitchen remodel involves noise, dust, workers entering the home, limited access, and weeks of altered routines. Homeowners may spend more money on takeout and may need to wash dishes in a bathroom, laundry room, or utility sink.

    Setting up a temporary kitchen before demolition can make the experience much more manageable.

    Choose a location such as a dining room, garage, basement, or other safe area. Depending on the home, a basic temporary setup might include:

    • A microwave
    • A toaster oven
    • A hot plate or portable induction burner
    • A coffee maker
    • A mini refrigerator
    • A folding table
    • Disposable plates and utensils
    • Storage containers
    • Simple pantry foods

    The temporary cooking area should be used safely, with appliances connected to appropriate outlets and kept away from water, children, and flammable materials.

    Homeowners should also plan financially for more restaurant meals and takeout than usual. Even people who intend to cook every meal in the temporary kitchen often become tired of the limitations as the project continues.

    Budgeting for that expense ahead of time makes it less frustrating.

    Protect the Rest of the Home

    Kitchen demolition creates more dust than many homeowners expect, and that dust can travel throughout the house.

    Before work begins, ask the contractor how the work area will be isolated. Dust-control methods may include plastic barriers, floor protection, sealed vents, air filtration, and negative air pressure.

    Move valuables, fragile items, electronics, artwork, and soft furnishings away from nearby rooms when possible.

    Pets also need a plan. Loud noises, open doors, unfamiliar workers, tools, and construction smells can create stress or safety risks. Pets may need to stay in a separate area of the home, attend daycare, or remain with a friend or family member during the most disruptive phases.

    Families with children should establish clear boundaries around the work zone and discuss where homework, meals, and quiet time will happen.

    People who work from home should also review the construction schedule. Knowing when demolition, cutting, drilling, or inspections are planned can help them arrange calls or work elsewhere during the loudest periods.

    Agree on a Communication Plan

    Before construction starts, confirm how communication will work.

    Homeowners should know who to contact, how quickly they should expect a response, and how frequently progress updates will be provided.

    Discuss:

    • Normal crew arrival and departure times
    • Which days work is expected
    • Who will unlock or secure the home
    • Whether water or electrical service will be interrupted
    • When inspections are scheduled
    • How delays will be communicated
    • How unexpected conditions will be documented
    • How change orders will be approved
    • When decisions are required from the homeowner

    A written change-order process is especially important.

    When additional work is discovered, the homeowner should understand what changed, why it is necessary, how much it will cost, and whether it affects the schedule. The work should be approved in writing before proceeding whenever possible.

    This protects both the homeowner and the contractor.

    The Best Remodels Are Planned Before They Begin

    Demolition day is exciting for many homeowners because it feels like the project is finally moving. The harder part often comes later, when the kitchen is still gutted, daily life feels upside down, and the finished result is not yet visible.

    The homeowners who handle that stage best are usually not the ones who avoided every problem. They are the ones who understood that disruption and uncertainty were part of the process and prepared for them.

    Before remodeling a kitchen, I wish every homeowner knew that the most important decisions are often not the most visually exciting ones.

    The layout matters more than the cabinet color. The lighting plan matters more than the pendant fixture. The electrical, plumbing, and structural work matter just as much as the countertops. The contractor’s communication habits matter as much as the initial design.

    Most importantly, a successful kitchen remodel is not just about creating a beautiful room. It is about creating a realistic plan for the house, the budget, the construction process, and the people who still need to live there while the work is happening.

    If you are past the research stage, our kitchen remodeling service covers cabinets, layout changes and the plumbing and electrical work that usually causes the surprises described above.