Bathroom Remodeling in Woodland Hills

Green Design and Build is a licensed general contractor (CSLB #1110975, bonded and insured) working out of Van Nuys, about twenty minutes east of Woodland Hills on the 101. Every bathroom we remodel is design-build — drawings, permitting and construction under one contract — so the person who draws your layout is accountable for the crew that builds it.

A site visit takes about two hours and costs nothing. You have a written proposal within 48 hours, and we reply to every inquiry within one business day. You have drawings and a written scope before anything gets demolished, so you approve the design, not a guess at it.

A Woodland Hills bathroom we built

The clearest example we can show you in Woodland Hills is a whole-home rebuild completed in 2026. It is not a bathroom-only job — we should be straight about that — but the bathrooms in it were built from nothing, and the primary bathroom was finished in large-format marble. The house was taken back to a handful of retained walls, given new foundations, framing, roof and mechanical systems, and rebuilt around what was left.

Finished primary bathroom with a freestanding tub and large-format marble tile in a Woodland Hills home
The finished primary bathroom

That project is worth reading if you are weighing a bathroom against something larger, because it shows what the decision to keep or remove walls does to the permit path and the sequence of the work. See the Woodland Hills whole-home rebuild, or browse all our projects. Bathrooms we have built as standalone jobs elsewhere in Los Angeles include a primary bathroom in Inglewood and a bathroom in West Hollywood.

What Woodland Hills houses need

Woodland Hills splits into two very different building problems, and which side of Ventura Boulevard you are on usually decides which one you have.

  • North of the boulevard — mostly post-war tract housing on slab. The bathrooms are small, the original cast iron or galvanized supply lines are at the end of their life, and the waste line is often cast iron under the slab. Moving a toilet or a shower drain means cutting and patching concrete, which is the single biggest cost swing on a slab-on-grade bathroom.
  • South of the boulevard, into the hills — raised foundations, sloped lots, and narrow streets. Working under the floor is easier, so relocating fixtures is cheaper than on a slab. Getting materials to the house is harder, and a hillside lot can add access and staging costs that have nothing to do with the bathroom itself.
  • Both — houses of this age frequently have no bathroom exhaust fan ducted to the outside, or one venting into the attic. That has to be corrected as part of the work, and it is the most common reason we find mold behind tile.

None of that is exotic. It is the ordinary condition of a Valley house built between about 1950 and 1975, and it is why a fixed price on a bathroom is only meaningful once someone has actually looked under the floor or at the slab.

Permits in Woodland Hills

Woodland Hills is in the City of Los Angeles, so the permit comes from LADBS. The counter that serves it is the Van Nuys Development Services Center at 6262 Van Nuys Blvd — the same office we use for our own Van Nuys work.

The dividing line that decides how long your permit takes is structural, not cosmetic. A bathroom remodel that keeps the walls where they are — even one that runs new circuits, moves a sink and re-does all the plumbing inside existing walls — is normally an express permit over the counter, with no plan check. Move a wall, or touch anything structural, and it goes to plan check with drawings.

That distinction is worth understanding before you design, because it is often the difference between starting in days and starting in weeks. Our guide to bathroom remodel permits in Los Angeles sets out what falls each side of the line, and LADBS permit costs covers the fees.

Want a real number for your project?

The site visit and the itemized written estimate are free.

What a bathroom remodel costs in Woodland Hills

These are typical Los Angeles budgeting estimates, not a price list or a quote. Your project can come in lower or higher depending on the house, the scope and the finishes; the only real number is a written proposal after a site visit. Where a Woodland Hills house pushes a job up, it is almost always the slab, the old supply lines, or hillside access rather than the bathroom itself.

ScopeTypical cost
Basic refresh, same layout (new flooring, tile, vanity, toilet, faucets, lighting, mirror, paint)$8,000–$18,000
Mid-range remodel (some layout change, tub-to-shower conversion, relocated vanity, moved plumbing, frameless glass, new exhaust fan)$18,000–$40,000
High-end renovation (full reconfiguration, custom vanity, large-format or natural stone tile, curbless shower, heated floor, premium fixtures)$40,000–$80,000+

For a fuller breakdown see what a bathroom remodel costs, and if you are converting a tub, tub-to-shower conversion cost.

How long it takes

A same-layout refresh runs 2–3 weeks of construction. A mid-range remodel that moves plumbing runs 3–5 weeks, and longer on a slab where the concrete has to be cut, patched and cured. A full high-end reconfiguration is 5–8 weeks. Add 1–4 weeks up front for design and the permit, longer if the job goes to plan check. Custom vanities and stone slabs are the items that most often set the start date, not the construction itself.

Questions we get asked

My house is on a slab. How much does that add?

It depends entirely on whether fixtures move. Keep the toilet and shower drain where they are and the slab is irrelevant. Move either one and we are cutting concrete, re-routing waste line, patching and letting it cure — typically a few thousand dollars and several extra days. This is the first thing we check on a site visit north of the boulevard, because it changes the design conversation completely.

Is my hillside house going to cost more?

Usually a little, and rarely for the reason people expect. A raised foundation actually makes moving plumbing easier than a slab. What costs money on a hillside lot is access — narrow streets, no staging area, carrying materials and carrying debris out. We price that honestly at the site visit rather than discovering it later.

Can you replace my old galvanized supply lines while you are in there?

Yes, and on a house of this age we usually recommend it for the bathroom at minimum. The walls are already open, so re-piping that bathroom costs a fraction of what it costs as a standalone job later. Whether to re-pipe the whole house at the same time is a separate conversation about budget and disruption, and we will give you a straight answer either way.

Do I need a permit for a bathroom remodel in Woodland Hills?

Yes. Any bathroom remodel involving plumbing, electrical or ventilation needs a permit from LADBS. If the walls stay put it is normally an express permit over the counter with no plan check. Work without one and you inherit a problem at resale, when the buyer’s agent pulls the permit history on the property.

Can you convert my tub to a walk-in shower?

Yes, and it is one of the most common requests we get in the Valley. In a same-layout conversion the drain usually stays close to where it was, which keeps it out of plan check. Read our walk-in shower guide and the cost of a tub-to-shower conversion.

How disruptive is this if I work from home?

A single bathroom remodel is one of the less disruptive jobs we do. Demolition is the loud part and it is over in a day or two. We contain dust, keep the route to the work area covered, and agree working hours with you before we start. Where a Woodland Hills house gets awkward is when it has only one bathroom — we will tell you honestly whether the schedule works for you or whether you should plan to be elsewhere for part of it.

Sources

The permit path described above is the City of Los Angeles rulebook as it stands, and LADBS can change it, so check the current requirements for your address before you plan around a start date; which side of the express-permit line your bathroom falls on is worth settling before the design is drawn, because it is often the difference between starting in days and starting in weeks. The cost and time ranges are ours, from the bathrooms we have built, and on a Woodland Hills job the slab, the old supply lines or hillside access move them more than the bathroom itself does.

Last reviewed 17 September 2026.

Tell us about your Woodland Hills bathroom

Send us the room and what you want it to become. We will come and look, tell you what your slab or your crawlspace actually allows, and put a written price in front of you within 48 hours. If your project is better served by something broader than a bathroom, we will say so. Our main bathroom remodeling page covers the wider service, and we also remodel kitchens in Woodland Hills.

Request Your Free Estimate

By submitting, you agree that a member of our team may call or text you about your project. We never sell your information. Privacy Policy This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Call Free Estimate