Bathroom Remodeling in Woodland Hills
Green Design and Build is a licensed general contractor (CSLB #1110975, bonded and insured) working out of Van Nuys, about twenty minutes east of Woodland Hills on the 101. Every bathroom we remodel is design-build — drawings, permitting and construction under one contract — so the person who draws your layout is accountable for the crew that builds it.
A site visit takes about two hours and costs nothing. You have a written proposal within 48 hours, and we reply to every enquiry within one business day. Nothing is demolished until you have approved a 3D rendering of the finished room.
A Woodland Hills bathroom we built
The clearest example we can show you in Woodland Hills is a whole-home rebuild completed in 2026. It is not a bathroom-only job — we should be straight about that — but the bathrooms in it were built from nothing, and the primary bathroom was finished in large-format marble. The house was taken back to a handful of retained walls, given new foundations, framing, roof and mechanical systems, and rebuilt around what was left.

That project is worth reading if you are weighing a bathroom against something larger, because it shows what the decision to keep or remove walls does to the permit path and the sequence of the work. See the Woodland Hills whole-home rebuild, or browse all our projects. Bathrooms we have built as standalone jobs nearby include a primary bathroom in Inglewood and a bathroom in West Hollywood.
What Woodland Hills houses need
Woodland Hills splits into two very different building problems, and which side of Ventura Boulevard you are on usually decides which one you have.
- North of the boulevard — mostly post-war tract housing on slab. The bathrooms are small, the original cast iron or galvanized supply lines are at the end of their life, and the waste line is often cast iron under the slab. Moving a toilet or a shower drain means cutting and patching concrete, which is the single biggest cost swing on a slab-on-grade bathroom.
- South of the boulevard, into the hills — raised foundations, sloped lots, and narrow streets. Working under the floor is easier, so relocating fixtures is cheaper than on a slab. Getting materials to the house is harder, and a hillside lot can add access and staging costs that have nothing to do with the bathroom itself.
- Both — houses of this age frequently have no bathroom exhaust fan ducted to the outside, or one venting into the attic. That has to be corrected as part of the work, and it is the most common reason we find mould behind tile.
None of that is exotic. It is the ordinary condition of a Valley house built between about 1950 and 1975, and it is why a fixed price on a bathroom is only meaningful once someone has actually looked under the floor or at the slab.
Permits in Woodland Hills
Woodland Hills is in the City of Los Angeles, so the permit comes from LADBS. The counter that serves it is the Van Nuys Development Services Center at 6262 Van Nuys Blvd — the same office we use for our own Van Nuys work.
The dividing line that decides how long your permit takes is structural, not cosmetic. A bathroom remodel that keeps the walls where they are — even one that runs new circuits, moves a sink and re-does all the plumbing inside existing walls — is normally an express permit over the counter, with no plan check. Move a wall, or touch anything structural, and it goes to plan check with drawings.
That distinction is worth understanding before you design, because it is often the difference between starting in days and starting in weeks. Our guide to bathroom remodel permits in Los Angeles sets out what falls each side of the line, and LADBS permit costs covers the fees.
What a bathroom remodel costs in Woodland Hills
These are the ranges we actually quote, all-in — design, permits, labour, materials and finishes. Where a Woodland Hills house pushes a job up, it is almost always the slab, the old supply lines, or hillside access rather than the bathroom itself.
| Scope | Typical cost |
|---|---|
| Basic refresh, same layout (new flooring, tile, vanity, toilet, faucets, lighting, mirror, paint) | $8,000–$18,000 |
| Mid-range remodel (some layout change, tub-to-shower conversion, relocated vanity, moved plumbing, frameless glass, new exhaust fan) | $18,000–$40,000 |
| High-end renovation (full reconfiguration, custom vanity, large-format or natural stone tile, curbless shower, heated floor, premium fixtures) | $40,000–$80,000+ |
For a fuller breakdown see what a bathroom remodel costs, and if you are converting a tub, tub-to-shower conversion cost.
How long it takes
A same-layout bathroom is usually three to five weeks on site once materials are in hand. A remodel that moves plumbing runs four to seven weeks, and longer on a slab where the concrete has to be cut, patched and cured. Add one to three weeks up front for design and the permit, longer if the job goes to plan check. Custom vanities and stone slabs are the items that most often set the start date, not the construction itself.
Questions we get asked
My house is on a slab. How much does that add?
It depends entirely on whether fixtures move. Keep the toilet and shower drain where they are and the slab is irrelevant. Move either one and we are cutting concrete, re-routing waste line, patching and letting it cure — typically a few thousand dollars and several extra days. This is the first thing we check on a site visit north of the boulevard, because it changes the design conversation completely.
Is my hillside house going to cost more?
Usually a little, and rarely for the reason people expect. A raised foundation actually makes moving plumbing easier than a slab. What costs money on a hillside lot is access — narrow streets, no staging area, carrying materials and carrying debris out. We price that honestly at the site visit rather than discovering it later.
Can you replace my old galvanized supply lines while you are in there?
Yes, and on a house of this age we usually recommend it for the bathroom at minimum. The walls are already open, so re-piping that bathroom costs a fraction of what it costs as a standalone job later. Whether to re-pipe the whole house at the same time is a separate conversation about budget and disruption, and we will give you a straight answer either way.
Do I need a permit for a bathroom remodel in Woodland Hills?
Yes. Any bathroom remodel involving plumbing, electrical or ventilation needs a permit from LADBS. If the walls stay put it is normally an express permit over the counter with no plan check. Work without one and you inherit a problem at resale, when the buyer’s agent pulls the permit history on the property.
Can you convert my tub to a walk-in shower?
Yes, and it is one of the most common requests we get in the Valley. In a same-layout conversion the drain usually stays close to where it was, which keeps it out of plan check. Read our walk-in shower guide and the cost of a tub-to-shower conversion.
How disruptive is this if I work from home?
A single bathroom remodel is one of the less disruptive jobs we do. Demolition is the loud part and it is over in a day or two. We contain dust, keep the route to the work area covered, and agree working hours with you before we start. Where a Woodland Hills house gets awkward is when it has only one bathroom — we will tell you honestly whether the schedule works for you or whether you should plan to be elsewhere for part of it.
Sources
Permit requirements on this page are City of Los Angeles rules and can change. Confirm what applies to your address with LADBS before you plan around a date. Cost ranges and durations are our own, from bathrooms we have built.
- LADBS, Van Nuys office — the Development Services Center serving Woodland Hills, at 6262 Van Nuys Blvd, 2nd floor, Room 251.
- LADBS, Building Permits — the work that requires a permit, and the rule that plans must be approved as a Building Plan Check before a permit is issued.
- LADBS Information Bulletin P/GI 2020-003, Express Permits — the work that can be permitted without plan check, including non-structural bathroom work.
- California Building Standards Commission, Title 24 codes — Part 5 Plumbing, Part 3 Electrical and Part 6 Energy. The 2025 edition took effect 1 January 2026.
Last reviewed 17 September 2026.
Tell us about your Woodland Hills bathroom
Send us the room and what you want it to become. We will come and look, tell you what your slab or your crawlspace actually allows, and put a written price in front of you within 48 hours. If your project is better served by something broader than a bathroom, we will say so.